BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 11, 2025

Site work and paving for a bridge / tunnel in Cambridge, Ontario. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

New permanent pedestrian bridge to be installed crossing the Speed River in a location to be determined. A new trail connection to the bridge is also considered a part of this study. TIMELINE: Schematic design is complete. An RFP for detailed design will be issued; timelines tbd. Further update may be available spring 2026.

Design

Bridges / Tunnels

$4,216,400.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
423
Active Projects
189
Bidding Soon
4,480
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

To Be Determined, Cambridge, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.