Site work, paving and renovation of a mixed-use development in Galway, New York. Design plans call for the renovation of a educational facility; theater / auditorium; water / sewer project; parking garage; for site work for a parking garage; for paving for a parking garage; road / highway; and road / highway.
The $3.1 million Capital Improvement Project will include: • Replace underground gas and diesel tanks at bus garage (installed in 2000) with above ground storage tanks • Replace fuel dispensing system at bus garage (installed in 2000) with a modern system that will help with fuel use and efficiency • Replace underground fuel oil heating tanks at bus garage (installed in 2000) with above ground storage tanks • Remediate soil as necessary • Replace two vehicle lifts at bus garage • Repair concrete floors in service bays and provide epoxy floor in service bays and parts room • Reconstruct pavement with heavy duty asphalt at various locations • Replace the oil/water separator that is too small and not functioning well To maximize State Aid on the proposed Capital Project, the district has to allot a certain percentage of the project to interior work in the school. The proposed 2021 Capital Project will contain minor renovations to the following areas that were not touched in the 2016 Capital Project including: • Restrooms near the auditorium • Restrooms near offices • Flooring near the entrance to the auditorium and gymnasium The project will also: • Replace an underground fuel tank in front of the Junior/Senior High School (installed in 1988) • Replace the pavilion at the track that collapsed in the winter of 2020. The pavilion will be the same size, but it may shift location because plans call for the addition of two separate restrooms with three toilets and three sinks in each. The pavilion may also include a sink and storage for future concessions, along with a custodial closet. • Replace the storage shed near the track with a larger building that can accommodate storage for athletic equipment The full project cost will be $3.1 million. The district will utilize $100,000 from the Capital Reserve, which results in $3 million bonded over 15 years. For aidable expenses, New York State Building Aid will reimburse 78.7% of the proposed Capital Improvement Project. After subtracting retiring debt and funds from the Capital Reserve, along with NYS Building Aid, the net local share will be approximately $65,000/year. For example, this will result in a 0.28% increase, which is equivalent to $8.48 annually on a home assessed at $100,000 in the Town of Galway. Voters approved the project on May 18, 2021. Bidding is anticipated to take place in the first quarter of 2022 with construction to take place in the spring/summer.
Design
Educational
$3,100,000.00
Public - State/Provincial
Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2022
Multiple Locations, Galway, NY
Related To This Project
Galway, NY
Bid Date: Oct 16 2023
Galway, NY
--
Galway, NY
Bid Date: Nov 22 2024
Galway, NY
Bid Date: May 19 2023
Galway, NY
Bid Date: Feb 03 2023
Galway, NY
Bid Date: Mar 28 2023
Galway, NY
Bid Date: Feb 03 2023
Galway, NY
--
Galway, NY
Bid Date: Jun 22 2022
Galway, NY
Bid Date: Jun 22 2022
Galway, NY
Bid Date: Jun 22 2022
Galway, NY
Bid Date: Jun 22 2022
Galway Central School District 2021 Capital Project - Contract No. 01 - Site Contract (SC) - 4741912
Galway, NY
Bid Date: Jun 22 2022
Galway, NY
Bid Date: Mar 23 2022
Galway, NY
Bid Date: Apr 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.