BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 11, 2025

Site work and paving for a civil project in L'Assomption, Quebec. Design plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

Reconstruction of De Bailleul bridge and Road 341 reconstruction and widening between Hwy 40 and Road 344. The project aims to improve mobility along Route 341 between Highway 40 and Route 344 in L'Assomption. It will also address safety issues, particularly at various intersections. The project involves widening Route 341 over a length of approximately two kilometers, including widening the Bailleul Bridge over the L'Assomption River and the overpass over Highway 40. TIMELINE: Project design is underway. Given the complexity and scale of the project the plans are being prepared by construction packages. It is undetermined now whether there will be one tender for the general contractor or the tendering process will be subdivided into several solicitations. Timelines of the project development are being finalized. Further update in spring/summer 2026. Note. The L'Assomption municipal council has already adopted a resolution authorizing a zoning change on the lots affected by the project.

Design

Roads / Highways

$100,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
177
Bidding Soon
2,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2027

Project location map

QC-341, L'Assomption, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.