BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in San Diego, California. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

SCOPE OF WORK: a) Mobilization. b) Hawthorne Basin work includes demolition of the existing gravel road, riprap drainage channel, down drain termination structure, and clearing and grubbing. Following demolition, the Hawthorne Basin will be excavated and a concrete lined earthen embankment, spillway, skimmer, outlet structure, and culvert will be installed. A new 36" HDPE down drain, inlet protection, and Type 2 energy dissipater will also be installed at a location further upstream of the basin. A new Type 2 energy dissipater will also be installed at the termination of the existing 36" CMP down drain. c) West Basin Skimmer/Pump System includes installation of a floating pump/skimmer with driven piles, diesel generator, and gravel staging pad. d) East Basin expansion work includes removal and salvage of the existing Type 2 energy dissipater, metal down drain flume, and a section of a 36" CMP storm drain; demolition of the existing standpipe, trash rack, and clearing and grubbing. Following demolition, the East Basin will be expanded and the Type 2 energy dissipater and metal down drain flume will be re-installed. A new outlet structure and skimmer will also be installed. e) Areas identified as erosion control areas will be stabilized with vegetation through soil preparation and application of hydraulically applied stabilizers (hydroseed and hydromulch). Straw wattle slope interruption devices will also be installed. f) Grade, moisture condition soil, and apply hydro-seed and hydraulic mulch in disturbed areas at Project Close-Out as indicated on Construction Drawings. g) Contract close-out and de-mobilization Online Q&A No Pre-Bid Meeting No Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 120 Working Days Liquidated Damages $1,000 Per Day License Requirements A

Bid Results

Water / Sewer

$1,381,841.00

Public - City

Site Work

Subscribe For Documents

104 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
33
Bidding Soon
922
All Active Projects
406
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2021

July 20, 2021

img_map_placeholder

5180 Convoy St, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.