BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a mixed-use development in Lubbock, Texas. Conceptual plans call for the construction of a fire / police facility; for site work for a road / highway; and for paving for a road / highway.

Nearly $41.5 million of the entire bond package would be for Broadway. The rest of the $174.5 million bond package would be for road projects across the city, the majority outside Loop 289. The other proposed street projects included in the bond package are: Widen Erskine St. between Ave. S and I-27 Rebuild 34th St. between Ave. Q and I-27 Widen 82nd St. between I-27 and MLK Jr. Blvd. Rebuild 34th St. between I-27 and Ave. A Rebuild 34th St. between Quaker Ave. and Slide Rd. Widen 114th St. between Indiana Ave. and city limits east of University Ave. Widen 114th St. between Frankford Ave. and Slide Rd. Widen Milwaukee Ave. between CR 6430 and 4th St. Widen MLK Jr. Blvd. between Loop 289 and 82nd St. Widen University Ave. between 98th St. and 114th St. Widen 98th St. between Upland Ave. and Alcove Widen Upland Ave. between 4th St. and 19th St. The three projects are $7.6 million for a new fire station in South Lubbock, $11.3 million to widen Erskine Street from the west city limits to Frankford Avenue, and $9 million to pave a total of about 5 miles of dirt roads across the city. The proposed Fire Station 20 will be located south of the future Loop 88, between Avenue P and Indiana Avenue. The $9 million will fund about 35 sections of unpaved streets across the city. Griffith says these streets are long overdue. Broken down by district, about two miles are in District 2, one mile each is in Districts 1 and 5, and Districts 4 and 6 will feature about 1/2 mile of pavement on currently unpaved roads. These bonds together, the $27.9 million non-voter approved bond and the $174.5 million bond if voters approve it, would increase the city's tax rate at its peak by 3.31 cents, according to information presented to the city council. As of June 22, 2022, this bond vote failed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Project Abandoned

Fire / Police

$174,500,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
10
Bidding Soon
212
All Active Projects
80
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

img_map_placeholder

Multiple Locations, Lubbock, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.