BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Clearwater, Florida. Completed plans call for site work for a water / sewer project.

As of August 7, 2024, project has been awarded. Construction start expected October 2024 and completion by Spring 2026. The City of Clearwater is seeking a Construction Manager at Risk (CMAR) firm to join the project team for the construction of the Clearwater Beach Marina Dock Replacement. In the rebuild, the seawall will be raised a foot and a half while the fixed docks for commercial boats and gangway access platforms will be raised up to 2 feet. Slips for recreation and transient boaters will be floating docks. The marina with 165 slips will be rebuilt in two phases starting first with the West end, and then transitioning to the East end for the final phase. General, Process, or Technical Questions concerning this solicitation should be directed, IN WRITING, to the Procurement Manager. The City of Clearwater (City) intends to engage a Construction Manager at Risk (CMAR) firm to provide management of the preconstruction and construction phase services (collectively referred to as the Services) as described herein for the Clearwater Beach Marina Dock Replacement, Project #21-0008-MA. The city anticipates the design to be completed by Spring 2023 with construction to be completed by Fall/Winter 2024. In conjunction with the new floating dock system, uplands work includes replacement of the utilities, seawall maintenance and the construction of new marina sales kiosks. The existing marina office building and restaurant will remain, but it is anticipated that some very minor renovations of the building will be necessary.

Award

Water / Sewer

$43,500,000.00

Public - City

Site Work

72

10

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
40
Bidding Soon
801
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2022

October 7, 2024

img_map_placeholder

25 Causeway Blvd, Clearwater, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.