BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 18, 2021 at 8:00 PM

Updated October 25, 2023

Site work, paving and outdoor lighting for a mixed-use development in West Springfield, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Contractor Qualification Highway Division The Town of West Springfield invites sealed bids from contractors for a Complete Streets Improvements Project. Proposed work activities include: performing all operations; furnishing all necessary labor, materials and equipment required for the shared path, sidewalks, ramps, crosswalks, pavement milling, hot mix asphalt paving, traffic lights and related work on Park Ave, Park Street, Main Street, Elm Street, Union Street and the Town Common in West Springfield. All work shall be substantially completed by October 31, 2022. Project shall be fully completed by November 30, 2022. No on-street work will be permitted between the dates of September 17, 2021 to October 3, 2021 and September 16, 2022 to October 2, 2022. The proposed design includes complete streets improvements at various intersections in West Springfield. Town Common The project includes the construction of a concrete shared use path to provide an off-street biking route that is comfortable for all ages and abilities. It will include new ADA compliant curb ramps, sidewalk improvements and landscape. Park Street The project includes new ADA compliant curb ramps, sidewalks sections replacement, two new high visibility crosswalks, roadway resurfacing, restriping of travel lanes and curb replacing. Park Avenue The transit stops will be consolidated and the bus stop will be relocated and improved with a turn-out and shelter. New ADA compliant curb ramps, crosswalks improvements, roadway resurfacing, restriping of travel lanes and curb replacing. Park Street, Main Street and Park Avenue Intersection The project includes new ADA compliant curb ramps, crosswalks improvements, roadway resurfacing, restriping of travel lanes, curb replacing and the installation of a new traffic light system Park Street, Union Street and Park Avenue Intersection The project includes improvements to the travel lane configuration, new traffic light equipment and signal optimization, new ADA compliant curb ramps, crosswalks improvements, roadway resurfacing, restriping of travel lanes, curb replacing.

Award

Roads / Highways

$2,514,730.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

90 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
696
Active Projects
373
Bidding Soon
4,875
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2021

July 5, 2021

Project location map

Multiple Locations, West Springfield, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.