BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Medford, Massachusetts. Working plans call for the renovation of a municipal facility.

The owner has determined a prequalified list of Construction Managers. A timeline for construction has not yet been established. The Medford Housing Authority invites qualified Construction Manager (CM) firms to submit Statements of Qualifications (SOQ) for the firm to provide Public Construction Manager at Risk Services for the Comprehensive Modernization of the Saltonstall Building Conceptual Estimated Construction Cost: $70 Million The Saltonstall Building at 121 Riverside Ave in Medford, MA was built between 1966-1968. The building structure consists of diagonally braced steel frame and piers that are covered with concrete, with a brick exterior facade. The Saltonstall Building is an eleven-story high-rise with 180 one-bedroom and 20 two-bedroom apartments for a total of 200 units serving elderly and disabled residents in Medford, MA. The Saltonstall Building is situated on a 4.25 acres site and has a total living area of 168,812 square feet, with a gross footprint of 14,991 square feet per residential floor. The building's structure is reinforced concrete frame (columns and beams) with concrete piers, diagonally braced at seven (7) locations per floor on the 2mnd through 11 th floors. The exterior is singlewythe brick with light-weight 8-inch concrete block backup and interior 2x3 wood horizontal strappinginfilled with mineral wool insulation-supporting 1/2 " gypsum wallboard. The buildings structural concrete spandrel beams and columns are visible on the facades. Floors are 3-inch topping slabs over steel deck, supported by bar joists spaced 2-ft on center. Floors are approx. 14,984 GSF in area, and the top of the roof, excluding the heights of the head houses. The building is fully sprinklered, in accordance with NFPA 13 and 901.3.1.1., 2015 IBC. Based on its height, number of stories, and sprinkler system, Saltonstall can be classified as Type IB construction. *specified LEED certification goal

Final Planning

Municipal

$102,000,000.00

Public - City

LEED Certification, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
171
Bidding Soon
2,750
All Active Projects
1,143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

September 21, 2022

img_map_placeholder

121 Riverside Ave, Medford, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.