Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2021 at 8:00 PM

Updated September 15, 2023

Renovation of a mixed-use development in Melrose, Massachusetts. Conceptual plans call for the renovation of a educational facility; and office development.

Study completion: September 2021 Perform needs assessment of Beebe School to determine costs to rehab for student occupancy or hybrid of classroom and school administration space. Study to include needs assessment of building and site. The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
744
Active Projects
357
Bidding Soon
4,999
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2022

Project location map

263 W Foster St, Melrose, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed