BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a playground / park / athletic field in Houston, Texas. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and for paving for a playground / park / athletic field.

This is a playground improvement project with lighting and electrical outlets. This also includes expanding a detention area. The project consists of replacing approximately 560 square feet of existing park play area and expanding the play area by approximately 1,600 square feet. The work will include the removal of an existing play structure as well as the relocation of 5 benches. Drainage for the proposed playground area will be provided through 47 Linear feet of perforated PVC underdrain piping which will connect into 48 linear feet of PVC that outfalls into an existing detention pond on site. To accommodate the proposed additional impervious area the existing detention pond will be expanded by 54 cubic yards. The OWNER reserves the right to reject any or all Bids and to waive formalities or irregularities in bidding. In case of lack of clarity in stating prices, the OWNER reserves the right to consider the most advantageous interpretation thereof orreject the Bid. This Section pertains to the earthwork generally consisting of excavation, filling, backfilling and subgrade preparation as required for construction of site retaining alls/structures, slab on grade walks, pavement surfaces, landscaped areas and the general shaping of the site as shown, described or reasonably inferred on the drawings. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. Topographic survey is provided by KUO dated August 13, 2012 C. Construction Means, Methods, Techniques, Sequences and Procedures: 1. The Contractor is solely responsible for, and has sole control over, construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work. 2. Shoring that is required to complete the Work, is considered a method or technique and is the sole responsibility of the Contractor. If a regulatory agency requires a licensed engineer to design, approve or provide drawings for shoring, then it is the sole responsibility of the Contractor to engage the services of a qualified Engineer for shoring design services. This Section pertains to the provisions for the control of erosion in the construction area and in stockpile areas including seeding, and the construction of temporary swales as required and shown on the drawings. All areas where existing vegetation and grass cover have been bared by construction activities shall be protected from erosion. B. Contractor is responsible for meeting all local, state and federal regulations regarding erosion control including the applicable provisions of the National Pollution Discharge Elimination System, Phase II, regulations from the Clean Water Act.

Bid Results

Playgrounds / Parks / Athletic Fields

$386,272.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

88 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
221
Bidding Soon
4,235
All Active Projects
1,721
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 21, 2021

August 20, 2021

January 10, 2022

img_map_placeholder

1701 Elgin St, Houston, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.