BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2021 at 8:00 PM

Updated January 26, 2024

Renovation of a water / sewer project in Naples, Florida. Completed plans call for the renovation of a water / sewer project.

The construction of the NCWRF EQ #3 Odor Control Improvements Phase 1 Construction Project located in Collier County, Florida. 1. Furnishing of all labor, material, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other means of construction necessary for: removing existing odor control equipment and associated piping, conduit, wiring, fiberglass reinforce plastic (FRP) air ducts, existing concrete pad(s), and cutting and capping existing services; installing new odor control equipment consisting of a RJV-1128 V-Bank Carbon Scrubber with 75 hp duty fan and exhaust stack; installing and connecting all process drains including duct and fan drains; installing new 42-inch FRP duct; connections to existing ducts, installing vehicular guard posts; forming and placing concrete for concrete pads and duct supports; installing all necessary raceways, junction boxes, wires, grounding, lightning protection, etc. for power distribution and instrumentation and control devices, sensors, transmitters and wiring; PLC hardware modifications; site improvements and restoration necessary to complete the Work as intended and in accordance with the Contract Document requirements. 2. Procurement of all permits and payment of all permitting fees that may be required for completion of the work, unless noted otherwise. 3. Sole responsibility for adequacy of plant and equipment. 4. Maintaining the Work area and site in a clean and acceptable manner. 5. Maintaining existing facilities in service at all times. 6. Protection of finished and unfinished Work. 7. Repair and restoration of Work or existing facilities damaged during construction. 8. Furnishing as necessary proper equipment and machinery, of a sufficient capacity, to facilitate the Work and to handle all emergencies normally encountered in Work of this character. 9. Furnishing, installing, and protecting all necessary guides, track rails, bearing plates, anchor and attachment bolts, and all other appurtenances needed for the installation of the devices included in the equipment specified. Make anchor bolts of appropriate size, strength and material for the purpose intended. Furnish substantial templates and shop drawings for installation. The anticipated project budget is: $815,000.

Award

Water / Sewer

$424,525.00

Public - County

Renovation

24

19

23

9

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
53
Bidding Soon
640
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2021

June 28, 2021

Project location map

10500 Goodlette-Frank Rd, Naples, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.