BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2021 at 8:00 PM

Updated January 29, 2024

Renovation of an educational facility in Pearland, Texas. Completed plans call for the renovation of a educational facility.

Pearland ISD is soliciting Competitive Sealed Proposals for the gym floor replacement at Pearland High School Searcy Center. Question Cutoff Date: 5/4/2021 04:00 PM (ET) The Work of Project is defined by the Contract Documents and consists of the following summary: At Searcy Gym at Pearland High School remove the existing wood floor including entire support of wood floor and wall base. Move existing bleachers as required to remove and install new wood gym floor per specification section 09 64 66. All painted court stripping as shown on drawing A1.00 to be included in base bid. All Graphics to be included in continency. Reinstall existing bleachers where originally located. Approximate budget is $230,000.00

Award

Educational

$230,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
391
Active Projects
224
Bidding Soon
3,267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.