Site work and paving for a sidewalk / parking lot in Lincoln, Nebraska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Questions concerning this bid process may be directed to City/County Purchasing at (402) 441- 8103 or purchasing@lincoln.ne.gov. We thank you for your cooperation in reducing exposure to the Covid virus. It is our hope that we will be doing business as usual again soon and these restrictions will be removed. Take care of yourself and your families, and thank you for doing business with the City of Lincoln, Lancaster County, and the Lincoln/Lancaster County Public Building Commission. The City/County Purchasing Department This contract is primarily focused upon the reconstruction of sidewalk and curb ramps. There is an immediate need for repair of sidewalks at the locations as shown on the plans. The Contractor shall coordinate the Beginningof Work date with the Project Manager. Once Work commences, it is expected that the Contractor remain on site until the completion of the project. This project includes sidewalk and curb ramp reconstruction in various locations in southeast Lincoln. The plan set indicates locations of sidewalk repairs needed and are approximate and subject to change. The Contractor shall coordinate with the Project Manager regarding upcomingrepair locations. The City will mark the actual sections of sidewalk and ramps which require repair upon receivingnotification from the Contractor a minimum of seven days in advance of anticipated construction. The Contractor shall be required to complete all repair work and site clean-up at any given location within seven workingdays ofinitial removals at that location. The Work will involve removal and reconstruction of curb and sidewalk accordingto Lincoln Standard Plan No. 600 for sidewalk ramp construction. The City's Project Manager will determine with the Contractor the specific type of ramp construction at each location. Sidewalk and curb ramps must be poured back within three (3) workingdays after removal, unless granted additional time by the Project Manager. Curb ramps on opposingcorners of intersections must be phased unless the Project Manager approves removal of multiple corners.

Award

Sidewalks / Parking Lot

$303,244.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
31
Bidding Soon
490
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

March 1, 2022

img_map_placeholder

Multiple Locations, Lincoln, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.