Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 11, 2021 at 8:00 PM
Updated October 24, 2023
Site work and paving for a civil project in Sarnia, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Road Reconstruction of Blackwell Sideroad between Confederation Line and 500 metres north of Churchill Line. Supply and install: - 19,000 square metres of Road Excavation - 4,400 tonnes of hot mix asphalt - 6,150 tonnes of Granular A - 14,350 tonnes of Granular B Type 2 - 4,200 linear metres of 150 mm sub-drain tile - 5,500 linear meters of shouldering - 450 linear meters of 300mm perforated tile with sock for east ditch Documents can be obtained at: https://sarnia.bidsandtenders.ca
Award
Roads / Highways
$1,672,917.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2021
June 21, 2021
Blackwell Rd, Sarnia, ON
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
