BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2021 at 8:00 PM

Updated October 24, 2023

Site work and paving for a civil project in Sarnia, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Road Reconstruction of Blackwell Sideroad between Confederation Line and 500 metres north of Churchill Line. Supply and install: - 19,000 square metres of Road Excavation - 4,400 tonnes of hot mix asphalt - 6,150 tonnes of Granular A - 14,350 tonnes of Granular B Type 2 - 4,200 linear metres of 150 mm sub-drain tile - 5,500 linear meters of shouldering - 450 linear meters of 300mm perforated tile with sock for east ditch Documents can be obtained at: https://sarnia.bidsandtenders.ca

Award

Roads / Highways

$1,672,917.00

Public - City

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
142
Bidding Soon
2,086
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2021

June 21, 2021

Project location map

Blackwell Rd, Sarnia, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.