Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2021 at 8:00 PM

Updated October 24, 2023

Site work and paving for a civil project in Sarnia, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Road Reconstruction of Blackwell Sideroad between Confederation Line and 500 metres north of Churchill Line. Supply and install: - 19,000 square metres of Road Excavation - 4,400 tonnes of hot mix asphalt - 6,150 tonnes of Granular A - 14,350 tonnes of Granular B Type 2 - 4,200 linear metres of 150 mm sub-drain tile - 5,500 linear meters of shouldering - 450 linear meters of 300mm perforated tile with sock for east ditch Documents can be obtained at: https://sarnia.bidsandtenders.ca

Award

Roads / Highways

$1,672,917.00

Public - City

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
144
Bidding Soon
2,000
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2021

June 21, 2021

Project location map

Blackwell Rd, Sarnia, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed