BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2021 at 8:00 PM

Updated February 7, 2025

Site work and paving for a road / highway in Oregon, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2.75" of HMA Binder Course and 1.25" of HMA Surface Course on the existing gravel surface on Mt. Morris Road.On the date that the Contractor begins work, they shall assume responsibility for the normal maintenance of all existing pavements, drives and temporary surfaces within the limits of the improvement. Normal maintenance shall include all repair work deemed necessary by the Engineer but shall not include snow removal operations. This responsibility shall end upon the completion and acceptance of all the pay items in the contract. Dust control during construction operations shall be considered a part of the maintenance and shall be done to the satisfaction of the engineer. All work shall be completed within 5 working days. All work shall be completed before September 10, 2021. This project consists of the construction of a new bituminous surface on an existing aggregate surface with necessary incidental work, for approximately 1,430 feet. Contractor shall notify the Township Road Commissioner 1 week prior to starting work on the project for shaping to be completed by the Township.

Bid Results

Roads / Highways

$42,556.00

Public - County

Paving, Site Work

15

8

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
409
Active Projects
235
Bidding Soon
2,794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2021

June 7, 2021

Project location map

Multiple Locations, Oregon, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.