BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Albany, New York. Completed plans call for the renovation of a municipal facility.

For Replace Roof, Center Courtyard, Main Floor - Electrical Estimated Range $100,000 - $250,000 SDVOB Goal 3% Bid Deposit $17,400 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. O.G.S. PROJECT NO. 45723-C-H-E Membrane roofing system, in its entirety, shall consist of a complete watertight, low odor membrane system consists of a reinforced resin cap membrane, torched modified bitumen base ply and vented nail base sheet on lightweight insulating concrete (low density concrete), closed to perimeter walls, except for required ventilation ports, penetrations and roof openings, with all accessories and leak detection systems indicated and required to achieve and verify watertightness the above. The custom fabricated metal roof system and architectural wall panel consists of a complete watertight enclosure constructed from metal sheets to the configuration and detail described herein and depicted on the architectural drawings accompanying these specifications. The system includes all custom formed sheet metal roofing, stamped and rolled ornamental trims, associated flashing and trim, clips, fasteners, sealant, solder, slip sheet, weather resistive barriers and underlayment. Provide the construction facilities and temporary controls necessary for the Work, unless otherwise indicated. 1. The construction facilities and temporary controls specified to be provided by a particular Contract shall be kept operational by that Contractor for the Work of all related Contracts at all times Work is being performed by a Contractor. 2. The construction facilities and temporary controls specified to be provided by a particular Contractor shall be installed as soon after award of the Contract as necessary to enable the Work of each Contract to proceed on schedule, and maintained until completion of the Work of all related contracts unless otherwise directed in writing. 3. Any Contractor who requires additions to the construction facilities and temporary controls specified to be provided by another Contractor, shall provide and maintain them.

Award

Municipal

$178,927.00

Public - State/Provincial

Renovation

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
92
Bidding Soon
1,400
All Active Projects
655
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

February 11, 2022

img_map_placeholder

State St, Albany, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.