Demolition, renovation and addition to an educational facility in Lakebay, Washington. Completed plans call for the addition of a 11,036-square-foot educational facility.

This project has been awarded to Kassel & associates, Inc. in the amount of $21,737,000. The scope of work includes but is riot limited to: Modernizations/re-configuration to to the existing, approximately 66,506 sf, main building and 11,036 sf of new additions. Key Peninsula Middle School is an existing 6th thru 8th grade middle school that will undergo a modernization, re-configuration and addition(s) to update the facility originally built in the early 1980s. The existing school is a 1story, 57,243 square foot tilt-up concrete building with a 9,263 square foot cast-in-place concrete gymnasium for a total existing building square footage of 66,506 square feet. The 11,036 GSF of new building additions include an administration area with a new exterior columned entry pavilion and canopy, a class-room addition, and a gymnasium addition. The areas of significant interior alteration include re-working of the existing adminis-tration area into new classrooms, a staff/work room and 2 new sin-gle-use restrooms. Upgrades take place in the Band/Music room, Choir and Stage/Platform in the Commons, Kitchen, and the Science classrooms. All spaces will receive new suspended grids an.d acoustic tile ceilings. Remaining. existing spaces will receive sig-nificant. finish upgrades, new fix-tures, and finishes in the exist-ing restroom.s. In addition to the expanded square footage, the gym will receive a new exterior canopy. Other existing exterior walls will receive new accent siding at key locations and new paint, at con-crete walls. The entire building will receive a new roof and metal parapet coping caps throughout. Proposed site work includes revi-sions and upgrades to the exterior entry paving approaches, and new plantings/landscaping in the area directly adjacent, to the primary and secondary building entries. Existing earth berms at building exteriors will be removed to allow re-grading, and to allow joint. sys-tem repairs at the existing con-crete tilt-up panels. Additional site scope includes re-configur-ing existing drive-lane and side-walks at the front of the building. Also, widening of the existing one-way drive lane in the back of the building to provide a wid-ened fire access route. Upgrades to the building water design sys-tem include: construction of a new pumphouse building to house the fire and irrigation pump and an above-ground concrete cast-in-place storage tank for fire and irrigation. Upgrades include a new well supply line requiring new paving along the one-way drive in back of the building. Bid Form - Part A Due: Wednesday, June 16, 2021 at 2:00 pin, at Peninsula School District Educational Service Center, 14015 62nd Ave NW Gig Harbor, WA 98332. Bids received after this time will not be accept-ed. Bid Form Part B Due: Wednesday. June 16, 2021 at 3:00 pm. Bid. Form.Part, B, and referenced attachments shall he submitted on forms provided. Bid Form -Part B received after this time will not be accepted and will also nullify Bid Form- Part A sub-mittal. Bid Form - Part C Friday. June 18. 2021 at 3:00 pm, at Peninsula School District Educational Service Center, 14015 62nd Ave NW Gig Harbor, WA 98332. Part C Form may be sub-mitted prior to this time, however any Part C Form received after this time will not be accepted. Requirement: A mandatory minimum 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available appren-ticeship programs. Right to Reject: The Owner reserves the right to accept the lowest or any other Bid, the right to reject any or all Bids, and the right, to waive any irregularities in any Bid. Withdrawal of Proposals: No Bid may be withdrawn, except with the express permission of the Owner, after the hour set for the opening' thereof, unless the award of Contract is delayed for a period exceeding 45 days.

Under Construction

Educational

$21,737,000.00

Public - City

Addition, Demolition, Renovation

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
26
Bidding Soon
659
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2021

July 5, 2021

img_map_placeholder

5510 Key Peninsula Hwy NW, Lakebay, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.