Site work for a power facility in Summerside, Prince Edward Island. Completed plans call for site work for a power facility.

**As of August 3, 2021, the project has not been awarded. A timeline for the award is not yet determined.** Engineering, Procurement and Construction of 10MW/20MWH Battery Energy Storage System (BESS) for the Summerside Sunbank Project. The scope of work for the Contractor includes all EPC services such as, but not limited to the management, permitting, manufacturing, design, construction, testing, delivery and clean-up required for the installation of a fully functional and ready for commercial application 10 MW /20 MWh BESS interconnected at 34.5 kV by the Contractor with the 34.5 kV Grid Connection, supplied and installed by others. The 34.5 kV Grid Connection is also connected, by others, to the 21 MW AC Solar Farm supplied and installed by others, and connected to the Utility Interconnection line going to the Summerside substation as shown in the single line diagram presented in Appendix A. The BESS must be designed knowing that it will be installed within a protected well field and near a residential area. The scope of work of the Contractor also includes: - The health and safety of the City of Summerside residents during the construction. - The security of the project, from the mobilization until final completion. - Onsite integrated office trailer to be provided by Solar PV contractor. Contractor to coordinate with Solar PV contractor. If Contractor requires their own trailer this is to be arranged through the owner at the BESS Contractor own cost. Initial installation charges, ongoing maintenance and recurring charge must be the responsibility of the Contractor. - Obtaining all permits and associated fees required to install and commercially operate the Summerside BESS. - Control and manage dust generation during all phases of the project. - Prevent water well pollution during all phases of the project. - Snow removal during winter months for the duration of the construction phase. * The project value listed reflects the total project estimate.

Post-Bid

Power Plant

$68,000,000.00

Public - City

Site Work

8

11

24

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
26
Bidding Soon
195
All Active Projects
81
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2021

July 1, 2021

img_map_placeholder

Multiple Locations, Summerside, PE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.