Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Washington, District of Columbia. Completed plans call for the renovation of a municipal facility; and municipal facility.
BACKGROUND Built between 1930 and 1936 the United States Department of Agriculture (USDA)'s South Building is listed on the National Register of Historic Places. The Historic Preservation zones, at the basement and the first floor, require restoration. Most importantly, there are many life-safety issues which shall be addressed to comply with contemporary building codes, including accessibility guidelines. Additionally, there are environmental hazards, which require abatement. Modernization of the South Building Wing 6 and 7 will address these concerns; thereby, ensuring the safety of USDA employees and visitors. The South Building is USDAs largest office building. The South Building encompasses approximately 2.2 million gross square feet occupying two (2) city blocks between Independence Avenue and C Street and 12th and 14th Streets, SW. There are six (6) main floors, a Sub-Basement (Ground Level), a Basement, and an Attic. The South Building has seven (7) wings, connected by a north building section called the Headhouse and a south building section called the Tailhouse. Clustered at the ends of each of the seven (7) north-south oriented wings are elevators, stairs, toilets, telecom and electrical closets. In between the wings are six (6) open courtyards for staff parking, excepting Court 4 which is for shipping and receiving. Courts 1, 2, and 3 have enclosed ramps which lead to the sub-basement level. The courtyards have side doors which allow access into or egress from the building wings. The building contains special spaces as the main cafeteria above Court 2, a 478-seat auditorium, a TV studio and a training center in Court 5, a major data center at Wing 4 basement, and a retail zone in the Wing 3 subbasement. Approximately 33% of the South Building was modernized previously between 1998 and 2011. The Master Plan and the Modernization Concept Plans were completed circa 1995. The previous modernization phases were implemented through the design-bid-build process. Wing 3 modernization was completed in 2000, Wing 4 in 2003, the headhouse offices from Wing 3 through 5 in 2005, Mail Operations Center at Courtyard 4 in 2006, and Wing 5 in 2011. The design for the Tailhouse offices from Wing 3 through Wing 5 was completed in 2011; however, construction was not initiated due to insufficient funding. The modernization of Wing 6 & 7 will be solicited and award in accordance with Two Phase Design-Build methods prescribed by FAR 36.3. The project will be executed through the Design-Build method utilizing a phased approach beginning with Wing 7 followed by Wing 6. Wing 7 design will commence after contract award. It is anticipated that Wing 6 design will not commence until after both Wing 7 design is completed and construction work has begun. Wing 6 design will be completed prior to completion of Wing 7 construction so that construction at Wing 6 can commence at that point. DURATION: 1,500 Calendar Days The work of the Wing 6 & 7 Modernization Project includes, but is not limited to, the following design disciplines and their related building/ site/ utility systems: 1. Civil Engineering 2. Geotechnical Engineering 3. Landscape Architecture 4. Environmental/ HAZMAT Remediation Engineering 5. Life Safety Engineering 6. Architecture 7. Historic Preservation 8. Interior Design 9. Structural Engineering 10. Blast & ATFP Engineering 11. Mechanical and HVAC Engineering 12. Plumbing Engineering 13. Fire Detection and Suppression Engineering 14. Electrical Engineering 15. Information Technology Engineering 16. Telecommunications Engineering 17. Vertical Transportation Engineering 18. Sustainability 19. Commissioning (General & Enhanced) The Wing 6 and 7 modernization shall be USGBC LEED Silver certified per LEED v4 IC+C, Commercial Interiors. Contractor and their Designers of Record shall develop their Sustainability approach to compliance and submit to Government for approval as part of their response to the Design-Build RFP. The Wing 6 & 7 Modernization shall include select exterior building repairs and upgrades, updated interior finishes, plumbing fixtures/ risers/ laterals, energy efficient lighting systems, updated MEP and Fire Detection and Suppression systems, including Telecom and Data upgrades and infrastructure as required to support the increased population and correct existing deficiencies. Exterior building work is limited to the replacement and repair of roof systems, flashings, gutters, exterior masonry parapets repairs and sealant/ backer-rod replacement. Repainting and replacement of sealant around select existing exterior windows and doors, and at the interior surfaces of these exterior components. Perform exterior masonry repairs to mitigate water damage at select locations identified in the Design Documents. Exterior work includes replacement of retaining wall (moat wall) and adjacent landscaping. The South Building shall remain fully operational 24 hours per day, 7 days per week and 365 days per year. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Under Construction
Municipal
$114,092,000.00
Public - Federal
LEED Certification, Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2022
January 31, 2023
1280 Maryland Ave SW, Washington, DC
Related To This Project
Washington, DC
Bid Date: Sep 15 2022
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Sep 20 2022
Washington, DC
Bid Date: May 30 2018
Washington, DC
Bid Date: Jan 28 2019
Washington, DC
Bid Date: Jan 21 2020
Washington, DC
Bid Date: Jun 01 2016
Washington, DC
--
Washington, DC
Bid Date: Sep 15 2022
Washington, DC
--
Washington, DC
Bid Date: Feb 27 2019
Washington, DC
Bid Date: Sep 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.