BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Hartford, Connecticut. Completed plans call for the renovation of a educational facility.

SOLICITATION DESCRIPTION: The City of Hartford is soliciting proposals for the Burr School Bathroom improvements. Burr Bathrooms General Notes: 1. Paint ALL metal doors and frames. Prep and refinish as required for a “Like new finish”. Remove hardware prior to painting for a consistent finish. 2. Scrape, patch, sand (as required), prime and paint block walls with epoxy in ALL bathrooms. 3. Scrape, patch, sand (as required) for smooth finish, prime and epoxy paint ALL Bathroom Glazed Wall Tile. 4. Replace partitions in all the specified bathrooms. All partitions to be Stainless Steel ASI Global Partitions https://globalpartitions.com/products/stainless-steel/ equipped with continuous wall brackets, floored anchored/overhead braced. Patch the old holes on the walls and floors to match the existing finishes. Add blocking to the plaster walls. 5. Replace flooring with poured epoxy flooring as specified. See Spec Section 09 67 23. Provide all necessary floor prep prior to the new floor installation for a smooth uniform finish. Strip all wax, patch holes and cracks, etc. Floor epoxy to be included up to the top of the existing base in all bathrooms. 6. Replace all damaged ceiling tiles in bathrooms with new ceiling tile. 7. Paint all existing ceiling grids. 8. Provide new 24” x 36” mirrors over all single sinks as per the finish schedule. Stainless steel edging will be required on the mirrors. The triple sinks in the group bathroom will require 72” x 36” mirrors over the sinks. Relocate existing soap dispensers as required. 9. Replace ALL owner supplied toilet paper dispensers in every stall. 10.Replace owner supplied paper towel dispenser as listed below. ARCADIS/O&G/C&R PROGRAM MANAGEMENT Burr School Bathroom Improvements 400 Wethersfield Avenue Hartford, CT Page 2 of 5 Specific Burr School Scope: 11.1 st FLOOR GIRLS: Replace 9 Stalls. Resinous Epoxy floor Paint with integrated base. Epoxy paint all CMU and plaster walls and ceilings. Patch all walls and ceilings prior to paint to make paint ready. Paint doors and frames. Supply and install 1 small mirror and 2 large mirrors. Replace toilet paper dispensers. 12.1 ST FLOOR BOYS: Replace 7 Stalls and 1 urinal screen. Resinous Epoxy floor Paint with integrated base. Epoxy paint all CMU and plaster walls and ceilings. Patch all walls & ceilings prior to paint to make paint ready. Paint doors and frames. Replace toilet paper dispensers. 13.2 ND FLOOR GIRLS: Epoxy paint all CMU and plaster walls and ceilings Patch all walls prior to paint to make paint ready. Paint doors & frames. 14.2 ND FLOOR BOYS: Epoxy paint all CMU and plaster walls and ceilings. Patch all walls & ceilings prior to paint to make paint ready. Paint doors and frames. 15.3 RD FLOOR BOYS (INCLUDING THE VESTIBULE): Replace 3 Stalls. Resinous Epoxy floor Paint with integrated base. Epoxy paint all CMU and plaster walls and ceilings. Skim coat all walls & ceilings prior to paint to make paint ready. Paint doors and frames. Replace toilet paper dispensers. Remove all 5 plywood patches and infill walls as required for a paint finish. Supply and install 2 large mirrors. Prep and paint existing stained wood trim. Supply and install 4”x4” ceramic tile on the vestibule walls to the underside of the ceiling. 16.3 RD FLOOR GIRLS (INCLUDING THE VESTIBULE & ADJACENT SINGLE BATH): Replace 5 Stalls. Resinous Epoxy floor Paint with integrated base

Award

Educational

$155,600.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
277
Bidding Soon
4,607
All Active Projects
1,911
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2021

June 18, 2021

img_map_placeholder

400 Wethersfield Ave, Hartford, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.