BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2021 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in Sacramento, California. Completed plans call for site work for a road / highway.

Striping, guardrail, realign curb & gutter, offramp pavement marker for wrong way driver preventative, striping bike lanes, and upgrade ADA curb ramps in Orange County on Santiago Blvd. between Lincoln off-ramp and Nohl Canyon Road and on Lincoln Ave. between Santiago Blvd. and North Tustin Street. Bidder Bond and Payment Bonds are required. Insurance is required. DVBE 5% goal is required. CONTRACT DURATION: 100 working days LICENSE(S) REQUIRED: Contractor must have either a Class A, or an applicable Class C license at time of bid opening

Bid Results

Roads / Highways

$272,909.00

Public - State/Provincial

Site Work

37

5

2

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
398
Active Projects
91
Bidding Soon
2,792
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2021

June 21, 2021

Project location map

Multiple Locations, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.