BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a water / sewer project in Mesa, Arizona. Completed plans call for the renovation of a water / sewer project.

As of June 23, 2022, a construction manager has been selected for the project. *The closed solicitation has been included below for reference: This project includes the of the existing multimode fiber optic cable system and installation of a single mode fiber system. It is anticipated that the existing conduits will be utilized, however, the project may require new conduit duct banks to separate the "City" fiber system from the plant SCADA system. The project will also include the replacement of obsolete PLC and RIO controllers with newer, up-to-date units. The project will also include the replacement of two Motor Control Centers (MCC) in the Operations Building and two in the Substation Building. The estimated construction cost range is $ $2,500,000-$3,500,000. The City anticipates completing construction by November 2023. The City has entered into a professional services contract with Jensen Engineering to design these improvements. The CMAR shall work closely with and be an integral part of this project team during the design and construction phases of the project. Questions pertaining to the Construction Manager at Risk selection process or contract issues should be directed to Stephanie Gishey of the Engineering Department at stephanie.gishey@mesaaz.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project includes the of the existing multimode fiber optic cable system and installation of a single mode fiber system. It is anticipated that the existing conduits will be utilized, however, the project may require new conduit duct banks to separate the "City" fiber system from the plant SCADA system. The project will also include the replacement of obsolete PLC and RIO controllers with newer, up-to-date units. The project will also include the replacement of two Motor Control Centers (MCC) in the Operations Building and two in the Substation Building. The estimated construction cost range is $ $2,500,000-$3,500,000. The City anticipates completing construction by November 2023. The City has entered into a professional services contract with Jensen Engineering to design these improvements. The CMAR shall work closely with and be an integral part of this project team during the design and construction phases of the project.

Award

Water / Sewer

$8,088,105.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
0
Bidding Soon
620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.