Renovation of a water / sewer project in Mesa, Arizona. Completed plans call for the renovation of a water / sewer project.
As of June 23, 2022, a construction manager has been selected for the project. *The closed solicitation has been included below for reference: This project includes the of the existing multimode fiber optic cable system and installation of a single mode fiber system. It is anticipated that the existing conduits will be utilized, however, the project may require new conduit duct banks to separate the "City" fiber system from the plant SCADA system. The project will also include the replacement of obsolete PLC and RIO controllers with newer, up-to-date units. The project will also include the replacement of two Motor Control Centers (MCC) in the Operations Building and two in the Substation Building. The estimated construction cost range is $ $2,500,000-$3,500,000. The City anticipates completing construction by November 2023. The City has entered into a professional services contract with Jensen Engineering to design these improvements. The CMAR shall work closely with and be an integral part of this project team during the design and construction phases of the project. Questions pertaining to the Construction Manager at Risk selection process or contract issues should be directed to Stephanie Gishey of the Engineering Department at stephanie.gishey@mesaaz.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project includes the of the existing multimode fiber optic cable system and installation of a single mode fiber system. It is anticipated that the existing conduits will be utilized, however, the project may require new conduit duct banks to separate the "City" fiber system from the plant SCADA system. The project will also include the replacement of obsolete PLC and RIO controllers with newer, up-to-date units. The project will also include the replacement of two Motor Control Centers (MCC) in the Operations Building and two in the Substation Building. The estimated construction cost range is $ $2,500,000-$3,500,000. The City anticipates completing construction by November 2023. The City has entered into a professional services contract with Jensen Engineering to design these improvements. The CMAR shall work closely with and be an integral part of this project team during the design and construction phases of the project.
Award
Water / Sewer
$8,088,105.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock Winning Bids!
Elevate your business with the premier source for commercial construction data. Gain instant access to up to five free projects and companies, and discover a treasure trove of opportunities. Subscribe now for comprehensive access to all contacts, documents, and vital details, and set yourself up to win more business than ever before!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
May 20, 2021
June 1, 2023
7750 E Brown Rd, Mesa, AZ
Related To This Project
Mesa, AZ
Bid Date: Jul 09 2020
Mesa, AZ
Bid Date: Jun 11 2020
Mesa, AZ
Bid Date: Apr 21 2020
Mesa, AZ
Bid Date: Dec 05 2019
Mesa, AZ
Bid Date: Jun 04 2020
Mesa, AZ
Bid Date: Jul 23 2020
Mesa, AZ
Bid Date: Aug 22 2019
Mesa, AZ
Bid Date: Aug 23 2018
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
Bid Date: Jul 14 2022
Mesa, AZ
--
Mesa, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--