BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement and renovation of a mixed-use development in Manchester, New Hampshire. Design plans call for site work for a medical facility; for the renovation of a medical facility; for asbestos abatement for a medical facility; and water / sewer project.

Contract Award Date: Mar 31, 2022 Contract Award Number: 36C24122C0047 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: LNBMVMPS1JA4 Contractor Awarded Name: ALARES LLC Contractor Awarded Address: QUINCY, MA 02169 Base and All Options Value (Total Contract Value): $679751.00000000 A/E STATEMENT OF WORK Maintain Building 1 sub-basement & basement utilities Project 608-21-100 INTRODUCTION: The basement and subbasement utilities are in desperate need of inspection and replacement. This project would address the main culprits of the deficient utilities, specifically the steam generation and condensate return systems. The work will include replacing steam traps, steam lines, condensate lines, strainers, valves, pressure reducing valves and pump stations. The underground steam supply and condensate return will also be replaced during this effort. There should be redundancy of underground utilities to preclude unnecessary trenching to maintain these lines. There will be some remaining asbestos insulation scattered in minimally accessible areas where the steam, water and electrical piping is located that will need to be abated as it is found. The majority of the work for this project would occur in the basement and subbasement of building 1 and 15. The project is slated for construction in 2022. There will be two items which will be priced as deduct alternates: These items are as follows. Feasibility study of switching from steam heat in hospital (bldg. 1 and 15) to hot water heating via steam to hot water heat exchangers. Feasibility study and conceptual design of medical center water treatment system SCOPE: The scope of this project consists of Architectural and Engineer (A/E) services required to complete the project. The period of performance for the design is 270 calendar days and shall begin upon issuance of the Notice to Proceed (NTP) by the Contracting Officer. The construction budget is $6,500,000. The method of contractor selection has not been determined at this time.

Design

Medical

$679,751.00

Public - Federal

Asbestos Abatement, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
143
Bidding Soon
2,390
All Active Projects
999
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2022

img_map_placeholder

718 Smyth Rd, Manchester, NH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.