BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Austin, Texas. Completed plans call for the renovation of a power facility.

Boiler Replacement SD's Budget Request Flintco, LLC (CM @ Risk) is soliciting budget pricing from LIMITED Trade Partners for the University of Texas at Austin Boiler Replacement. This project consists of demolishing two existing 1945 vintage, 75,000 lb/hr steam boilers and replacing them with two new 175,000 lb/hr steam boilers inside the Hal C. Weaver Power Plant on the main campus. Major scope elements will include all necessary hazardous material abatement and disposal, selective demolition and associated disposal, procurement and installation of equipment, including but not limited to new boilers, associated piping, electrical gear/equipment, electrical feeders, controls, instrumentation, controls programming and emissions monitoring and control systems. The planned boiler system replacement is to renew the system while maintaining UEM's high level of standards, improving overall efficiencies of the existing system and safely construction of the new systems with minimal impact to existing campus utility operations. Scope includes: demolition, plumbing, mechanical and electrical. Boiler pricing is being procured by Flintco, Mechanical need not price them in this budget. Clarifications are due 11/11/2022 @ 2:00 PM via email at ausbids@flintco.com. Project Description: The University of Texas at Austin wishes to demolish two existing 1945 vintage, 75,000 lb./hr. steam boilers and replace them with two new 175,000 lb./hr. steam boilers inside the Hal C. Weaver Power Plant on the main campus of the University of Texas at Austin, located at 301 E 24 th St., Austin Texas. Flintco has secured a Construction Manager at Risk (CMAR) Contract to develop a GPM and executed the work. As the first step of this process, we have been asked to validate the Schematic Design (SD) Budget. Flintco is requesting Budgetary proposals to furnish and install (2) new 175,000 PPH Boilers, along with other ancillary support elements as described in the attached.

Post-Bid

Power Plant

$500,000.00

Public - State/Provincial

Renovation

60

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
2,358
All Active Projects
920
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.