BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a religious / funeral development in Cheyenne, Wyoming. Completed plans call for site work for a religious / funeral development.

Cheyenne Cemeteries Irrigation System Replacement for the City of Cheyenne - Removal of existing irrigation equipment and the installation of a new irrigation system, booster pumps, and electrical upgrades. Bid guarantee in the amount of 5% of the total bid must accompany any bid submitted. The 5% bid guarantee may be in the form a bid bond secured and issued by a surety or guaranty company authorized to do business in the State of Wyoming or a cashier's check made payable to the City of Cheyenne. The successful bidder shall furnish and pay for satisfactory performance and payment bonds in the amount of one hundred percent (100%) of the accepted bid. A surety bond is required for contracts over $150,000.00. Provisions of Wyoming Statute 15-1-113 are, by reference, made an express part of the contract documents. The City reserves the right to reject any or all bids and to waive any formalities in the bidding. 1. Alternate No. 1 Install a complete irrigation system at the Jewish/IOOF Cemetery Irrigation. Installation to include the 4" mainline from just downstream of the flow sensor at Beth El Cemetery as well as the 3" mainline from zone 58A at Beth El Cemetery. Gate valves feeding both of these mainline sections are to be included in the base bid amount. The point of connection modifications, booster pump and electrical service are not included in Alternate No. 1. 2. Alternate No. 2 Complete point of connection modifications and install the booster pump and electrical service at Jewish/IOOF Cemetery. Provide pipe and fittings as required to connect to the existing irrigation system at the cemetery. 3. Alternate No. 3 The base bid includes preparation for seeding of trenches and disturbed areas by the Contractor with seeding completed by the Owner. For Alternate No. 3, provide a price to seed disturbed areas at Beth El and Lakeview Cemeteries. All existing turf grassed surfaces including but not limited to mainline trenches, pot holes, and all other areas disturbed during construction shall be restored by seeding by the Contractor. Substantial Completion, September 30, 2023, Final Completion, October 31, 2023

Award

Religious / Funeral

$2,068,800.00

Public - City

Site Work

23

15

8

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
19
Bidding Soon
345
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2022

February 20, 2023

img_map_placeholder

To Be Determined, Cheyenne, WY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.