Site work and paving for a mixed-use development in Temecula, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Contract Documents to construct for the above-stated project. The general items of work include: Roadway rehabilitation of the full width of Pauba Road approximately from Margarita Road to Butterfield Stage Road, and the full width of Butterfield Stage Road from 405 feet south of De Portola Road to 230 feet south of Rancho California Road. The roadway rehabilitation shall generally consist of 2 to 3 inches of cold milling and placement of 2 to 3 inches of asphalt concrete. The project also includes the removal and replacement of existing roadway striping, pavement markings, and traffic signal loops, the removal and reconstruction of existing pedestrian ramps in order to comply with current ADA standards, and adjustment of existing utilities to grade. The Contractor and all subcontractors for the Work shall comply with all applicable Federal, State, Riverside County, and City of Temecula statutes, regulations, orders, and ordinances. This requirement specifically includes, without limitation, compliance with the "Safety and Health Guidance COVID-19 Infection Prevention in Construction" issued by the California Department of Industrial Relations, Division of Occupational Safety and Health and Safety on July 20, 2020 and as may be amended from time to time by the Department, relating to mitigating the transmission of COVID-19 on the project site and mitigating the transmission of COVID-19 by employees or workers of Contractor and its subcontractors in their contacts with City employees and consultants. Prior to the pre-construction meeting, the Contractor shall submit to the City a "COVID-19 Mitigation Program" implementing these requirements and shall post the COVID-19 Mitigation Program on the project site in a manner designated by the City's Project Manager. The failure of employees or workers of the Contractor and all subcontractors on the Work to comply with these requirements shall be a default per Section 6-7.1. Contractor acknowledges that, in the event that the Engineer suspends the Work as a result of such failure by Contractor or one of its subcontractors to comply with these requirements, City is not responsible for the delay, and the Contractor is not entitled to compensation pursuant to Section 6-4.3. The Contractor shall also pay to the City the costs and expenses incurred by the City resulting from the failure of employees of the Contractor and all subcontractors on the Work to comply with these requirements including, but not limited to, the salaries and benefits for City employees who are unable to work, and workers compensation benefits and expenses. Delays in the Work resulting from Contractor's or its subcontractor's failure to comply with these regulations shall not be considered an unforeseen event entitling Contractor to an extension of time or payment for delay pursuant to Section 6-4 of the Standard Specifications. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No Contractor or subcontractor may be awarded a contract for public work unless registered with the DIR pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring & enforcement by the DIR. Response Types Line Items Bid Bond Type of Award Lump Sum License Requirements A or C-12 Liquidated Damages $1,000 per calendar day Project Duration 144 working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 05/25/2021 2:00 PM (PDT)
Award
Roads / Highways
$2,733,770.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2021
August 2, 2021
Multiple Locations, Temecula, CA
Related To This Project
Temecula, CA
Bid Date: Dec 22 2020
Temecula, CA
Bid Date: Nov 19 2020
Temecula, CA
Bid Date: Jul 11 2019
Temecula, CA
Bid Date: Apr 21 2022
Temecula, CA
--
Temecula, CA
Bid Date: May 11 2022
Temecula, CA
Bid Date: Apr 12 2022
Temecula, CA
Bid Date: May 19 2022
Temecula, CA
Bid Date: Nov 14 2018
Temecula, CA
Bid Date: Oct 17 2018
Temecula, CA
Bid Date: Aug 26 2019
Temecula, CA
Bid Date: Jun 11 2019
Temecula, CA
Bid Date: Aug 27 2018
Temecula, CA
Bid Date: Apr 21 2022
Temecula, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.