BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a road / highway in Ceres, California. Completed plans call for site work for a road / highway.

The work consists of installing fiber optic and signal interconnect cable and associated hardware to connect signalized intersections and update traffic signalization timing to the Citys existing Traffic Operation Center. The proposed work shall be performed in accordance with the plans, specifications and other contract documents and shall consist of the following General work description: Phase III Base Bid - Central Avenue from Don Pedro Rd to Service Rd. Phase III Additive Alternate Bid - Service Road from Central Ave to Blaker Rd. Phase IV Base Bid - Whitmore Avenue from Crows Landing Rd to Morgan Rd. Phase IV Additive Alternate Bid - Crows Landing Rd from Whitmore Ave to Hackett Rd. The work consists of installing fiber optic and signal interconnect cable and associated hardware to connect signalized intersections and update traffic signalization timing to the City's existing Traffic Operation Center. The project will also include the development of the City's master ITS system. Estimated construction cost for this project is $700,000. The project will also include the development of the City master ITS system. Contractor Starts Construction November 29, 2021 Time of Completion 40 Caltrans Working Days Estimated construction cost for this project is $700,000. Technical questions shall be in writing and should be directed to: Attn: Sam Royal City of Ceres, Engineering Department 2220 Magnolia St., Ceres, CA 95307 Phone: 209.538.5617 samir.royal@ci.ceres.ca.us Each bid must be sealed and accompanied by cash, a cashiers check, certified check or bid bond, executed on the prescribed form, in an amount not less than ten (10) percent of the total bid price payable to the City of Ceres. The successful bidder shall furnish a payment bond and a performance bond. Each bond is to be executed in a sum equal to one hundred percent (100%) of the contract price The successful bidder must possess a current Class A or C-10 Contractors License issued by the State of California and must be licensed from contract award through Contract acceptance. The City reserves the right to reject any and all bids. Any bid not conforming to the intent and purpose of the Contract documents may be rejected. The City reserves the right to make all awards in the best interest of the City. The DBE Contract goal is 9%. MBE (12.3%), WBE (6.9%) Pre-Construction Meeting w/ Contractor and City - October 26, 2021

Award

Roads / Highways

$760,545.00

Public - City

Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
82
Bidding Soon
1,618
All Active Projects
691
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.