BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2021 at 8:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Louisville, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Question Acceptance Deadline 05/20/2021 05:00 PM EDT Questions are submitted online No The Work consists of but is not limited to demolition, water main replacement and water service line replacement, concrete replacement, asphalt patching, traffic control, incidentals and work appurtenant thereto. General Requirements - Insurance Required - Bidder Prequalification/Preregistration Required - Contractors License Required - Installation Required This work shall consist of furnishing all labor, materials, equipment, loading, haul, and disposal for STRUCTURE BACKFILL (COMPLETE IN PLACE) to remove unsuitable backfill material. Upon direction of the Engineer, the Contractor shall remove and dispose of existing unsuitable backfill material. The provisions of STRUCTURE BACKFILL (COMPLETE IN PLACE) will only be implemented in areas designated by the Engineer where existing backfill material is determined unsuitable. All material removed shall become the property of the Contractor and shall be properly disposed of outside the limits of the project at no additional cost. This work shall also include furnishing all labor, material, equipment, loading, haul, placing and compaction of STRUCTURE BACKFILL(COMPLETE IN PLACE). Structure backfill shall have a liquid limit not exceeding 35 and a plasticity index of not over 6 when determined in conformity with AASHTO T89 and T90 respectively. Structure Backfill shall be a combination of one part CLASS 6 Recycled Concrete Recycled Base Course and two part Class 4 recycled concrete base course Specifications for Road and Bridge Construction, 2011 Edition, Classification for Aggregate Base Course Section 703. Samples and test data on material to be used shall be submitted to the Engineer stating the structure backfill meets these requirements.

Award

Water / Sewer

$2,120,443.00

Public - City

Paving, Site Work

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
58
Bidding Soon
1,236
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2021

June 28, 2021

Project location map

Multiple Locations, Louisville, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.