BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2021 at 8:00 PM

Updated February 15, 2024

Site work and paving for a road / highway in Saint Augusta, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of June 16 the project Knife River Corporation for $594,627.44. Estimated Contract Quantities 16,230 Sy Edge Mill Bituminous Surface (6') 15,650 Gal Bituminous Material for Tack Coat 4,880 Tn Type Sp 9.5 Wearing Course Mixture-spwea230b 1.5" Thick 2,450 Tn Type Sp 4.75 Leveling Course Mixture-spnwd230b 0.75" Thick 8 Ea Temporary Traffic Control 76 Ea Adjust Casting Manhole, Together With Appurtenant Work All work shall be completed on or before July 31, 2021 In general, the mill and overlay work consists of improving surface drainage, and vehicle ride, pavement markings and other related appurtenances. Placement ofany adjusting rings (sanitary sewer, water and storm drain) will be approved by the Engineer and will be to facilitate the Contractor providing a 1/4 " bituminous lip. A 6-foot edge mill tapering from 2 inches at the face of gutter to zero inches at a distance 6 feet from face of gutter shall be complete along both sides of all roadway sections. The Engineer reserves the right to delete and/or modify edge milling as the Engineer determines in the field at time of construction.

Award

Roads / Highways

$594,627.00

Public - City

Paving, Site Work

18

13

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
149
Bidding Soon
1,458
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2021

June 28, 2021

Project location map

Multiple Locations, Saint Augusta, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.