Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 2, 2021 at 8:00 PM
Updated September 15, 2023
Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.
**As of July 7 2021, the project has not yet been awarded. A timeline for award has not yet been established.** This Project is located at seven different sites in Seattle: 1) 44th Ave SW from SW Brace Point, Dr to SW Cambridge St.; 2) Lake Washington Blvd from E Howell St to E Olive Ln; 3) B Huron St, from Euclid Ave to Power Ave, and Power Ave from E Huron St to B Superior St; 4) 17th Ave NE from NE Naomi Pi to NE 62nd St; 5) S Charles St from 23rd Ave S to 25th Ave S; 6) 36th Ave NW from NW 65th St. to NW 64th St; and 7) SW Spokane St, from 33rd Ave SW to Fauntleroy Way SW. This Project consists of the follow-ing elements of Work: Abandon in-place existing watermains; install new ductile iron and/or HDPE .watermain pipe ranging from 4 inch to 16 inch in diameter by open-trench and horizontal directional drilling (HDD) methods; sanitary sewer pipe replacement; assist. SPUD water operations with cut, cap, blocking and connections to existing watermains, service connection transfers, and tempo-rary connections; and the restara-tion of roadway and landscaping. No pre-bid site inspection has been scheduled for this Project. For purposes of the Inclusion Plan, this is considered a "UNDERGROUND" type of project. with a Past Performance of 14% WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please con-tact Miguel Beltran at Miguel. beltran@seattle.gov or 206-684- 4525. Back-up contact is Carmen Kucinski at carmenkucinski@ seattle.gov or 206-684-0188. The Engineer's Estimate for this Project is $4,040,000.00 Questions must be submitted no later than 5:00 p.m. 3 Business Days before the Bid Opening Date. Only written questions will be accepted for this project. Please submit your questions to Kai Fan at kai.fan@seattle.gov.
Award
Water / Sewer
$3,911,013.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2021
August 23, 2021
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Sep 08 2022
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: May 12 2021
Seattle, WA
--
Seattle, WA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed