BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Brevard, North Carolina. Completed plans call for the renovation of a educational facility.

**As of April 28, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Blue Ridge Community College request proposals to provide a turnkey project inclusive of all labor, materials, permits and inspections to rough in and trim out the plumbing of the new lab workstations. This project includes the following trades plumbing, mechanical, and electrical. GS 143-128.2 establishes a ten percent (10%) goal for participation by minority business in total value of work for each State building project. As an alternate, Contractor shall furnish pricing for a Performance Bond and Payment Bond executed by a surety company authorized to do business in North Carolina Blue Ridge Community College request proposals to provide a turnkey project inclusive of all labor, materials, permits and inspections to rough in and trim out the plumbing of the new lab workstations. This project includes the following trades plumbing, mechanical, and electrical. - GC needs to install a dedicated breaker with GFCI outlets installed on each existing and new stations. - GC is responsible for all walls to be painted. - New flooring installed will be (LVT). Owner will provide type and color for the new flooring and GC will provide the materials and labor as needed. - Owner can provide test results of the asbestos in the room GC will work with an asbestos abatement services for the removal of Asbestos flooring materials in the classroom. - GC is responsible for remove existing HVAC equipment, provide and install two (2) 24000 BTU (2 ton) wall hung air handlers and provide and install a new 4 ton multizone heat pump. - Concrete removal, pour back, floor patch, repair to the floor where concrete was cut out and the metal plates are between existing lab stations. - Access to the shut offs under the metal plate must be provided after installation of new flooring. This is where gas and water shut offs are located

Post-Bid

Laboratories

$300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
119
Bidding Soon
1,360
All Active Projects
610
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 20, 2022

May 20, 2022

img_map_placeholder

45 Oak Park Dr, Brevard, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.