BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lancaster, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Work within this section includes, but is not limited to, the furnishing of all equipment, labor and materials and performing all operations necessary to construct and maintain erosion and sedimentation control devices and/or systems in accordance with the specifications, applicable drawings and Contract Documents. Located at 901 Centerville Road, Lancaster, PA 17601, the work for this project generally includes removing 445 LF of existing 5" cast iron piping, installing 445 LF of 8" PVC SDR-35 sanitary sewer piping and a manhole, removing existing concrete flow channels and casting in place new channels in the same manholes, 60 LF of concrete encasement, and ESC controls, as shown in the Drawings and described in the Contract Documents. A nonmandatory pre-Bid conference may be held at the project site if deemed necessary and can be safely accomplished due to safety considerations and restrictions based on COVID19. A minimum of 7 days' notice will be provided if a pre-Bid conference is held. Representatives of Owner and Engineer will be present to discuss the Project if a pre-Bid conference is held. Bidders are not required to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. Requests for clarification are due Friday, May 14, 2021 5:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. Work must start after students and teachers are no longer in the building. The first day available for work is June 8, 2021. Contractor must indicate to the School District at least a week ahead of time when work is scheduled to occur for shutdowns of sanitary sewer service during that period of time. o A note was added to sheets C-1 and C-2 in Addendum 1 noting that any work scheduled to the combined receiving manhole for the elementary and middle school must occur on a Friday, with the concrete being allowed to cure on a Saturday and Sunday. On the following Monday, the manhole must be capable of receiving flow from Centerville Middle School, while a plug mayremain in the newly installed PVC pipe penetration. Centerville Middle School must have full access to sewer facilities every Monday through Thursday during the duration of the work.o Substantial Completion is scheduled for July 9, 2021, and Final Completion is scheduled for July 21, 2021

Award

Water / Sewer

$57,650.00

Public - County

Site Work

25

26

10

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
117
Bidding Soon
2,173
All Active Projects
974
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2021

July 19, 2021

img_map_placeholder

901 Centerville Rd, Lancaster, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.