BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and addition to a civil project in Chino, California. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Offsite Dual 6" Diameter Brine Line Discharge Line From Ewtp Expansion Project Contractor Shall Provide All Supervision, Labor, Tools, Parts, Material, Equipment and Other Items Necessary to Perform All Aspects of the Offsite Dual 6" Diameter Brine Line Discharge Line From Eastside Water Treatment Plant Expansion Project - Phase III Liquidated Damages - 3,000 per day Estimated Bid Value - $5,000,000.00 Start/Delivery Date - Start Date: Late August of 2021; End Date: 260 Calendar Days Project Duration - Two Hundred Sixty (260) Calendar Days Online Q&A - Yes Q&A Deadline - 06/02/2021 10:00 AM (PDT) Work may include but not be limited to: Will include construction of approximately 18,640 lineal feet of dual 6" diameter DR-35 PVC pipeline to carry brine and 34 (each) five (5) feet diameter sewer manholes installed in conjunction with the pipeline. The construction will be on Euclid Avenue (State Route 83 (SR83)) in Caltrans right of way, Merrill Avenue in the City of Chino right of way, Bon View Avenue, Schaefer Avenue both being in the City of Ontario right of way. Traffic control plans and implementation will be required for the duration of the construction activities. Removal of approximately 180 trees and roots in City of Ontario right of way along Bon View Avenue. Protect in place existing improvements. Replacement of existing improvements such as fences, walls, landscaping and irrigation. Pavement repair, grind and overlay and street restoration. Pavement markings, RPM and legends as necessary due to disturbance from construction activities. Additionally, other improvements as shown on the Project Plans and required by the Project Specifications

Award

Water / Sewer

$3,331,276.00

Public - City

Addition, Demolition, Site Work

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
103
Bidding Soon
2,237
All Active Projects
1,007
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2021

August 6, 2021

img_map_placeholder

To Be Determined, Chino, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.