Site work and new construction of a water / sewer project in Whitewater, Wisconsin. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

ADVERTISEMENT TO BID SECTION 00 11 13 CITY OF WHITEWATER WHITEWATER, WISCONSIN SOUTHWEST ELEVATED TANK CONTRACT 1-2021 The City of Whitewater, Wisconsin (OWNER), located at 312 West Whitewater Street, Whitewater, WI 53190, is requesting Bids for the construc- tion of the following Project: Southwest Elevated Tank Contract 1-2021 Electronic Bids for the construc- tion of the Project will be received by OWNER until Thursday, June 3, 2021, at 11 a.m., local time. At that time the Bids received will be publicly downloaded and read aloud publicly via teleconference. The login information for the teleconference is as follows: (608) 571-7149, Conference ID349209869#. The Project includes the following Work: Construction of a new 750,000 gallon spheroid elevated tank and associated coatings, site, utility, HVAC, mechanical, electrical, and control systems improvements. Complete digital Project Bidding Documents are available at www.strand.com or at www. questcdn.com. Download the digital Bidding Documents for $50 by inputting Quest project number 7800628 on the website's Project Search page. Please contact QuestCDN.com at (952) 2331632 or info@questcdn.com for assistance with free membership registration, downloading, and working with this digital project information. For this project, bids will Only be received and accepted via the online electronic bid service through QuestCDN.com. To access the electronic bid form, download the project documents and click the online bidding button at the top of the advertisement. The issuing office is Strand Associates, Inc.(R), 910 West Wingra Drive, Madison, WI 53715. All Bidders submitting a sealed Bid shall obtain the Bidding Documents from QuestCDN.com Bidders who submit a Bid must be a Plan Holder of record at the Issuing Office. Bids from Bidders who are not on the Plan Holders List may be returned as not being responsive. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. Bidders shall comply with federal wage rates. Bidders shall comply with the President's Executive Order No. 11246, Equal Employment Opportunity as amended. The City of Whitewater reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. Prospective Bidders are required to complete and submit a prequalification questionnaire with supporting documents to OWNER (see Instructions to Bidders). Prequalification forms will be provided with Bidding Document sets. Completed forms are to be submitted no later than 11 a.m., local time, on Thursday, May 27, 2021. Any Contract or Contracts to be awarded are expected to be funded in part by a grant from the Community Development Block Grant Program by the Wisconsin Department of Administration, Division of Energy, Housing and Community Resources, and will be subject to the regulations contained in 40 CFR Parts 31, 33, and 35 of the Federal Statutes. The Contract shall be subject to Federal Davis-Bacon wage rates. The Strand Associates, Inc.(R) project manager is Ryan D. Wood, P.E. and can be contacted at Strand Associates, Inc.(R), 910 West Wingra Drive, Madison, WI 53715, (608) 251-4843, regarding the project. For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Published by the authority of the City of Whitewater Michele Smith, City Clerk Bidder agrees that the Work will be substantially complete on or before September 10, 2022 and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before October 6, 2022. In addition to the required substanitial and final completion timnes, there are milestones by which certain items of work must be completed. See General Requirements for milestone requirements. Milestone 1: April 30, 2022 6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times

Bid Results

Water / Sewer

$2,797,900.00

Public - City

New Construction, Site Work

15

25

4

13

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Storm Drainage, Sump Pump Discharge Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
139
Bidding Soon
2,417
All Active Projects
1,012
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2021

July 5, 2021

img_map_placeholder

797 Indian Mound Pkwy, Whitewater, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Southwest Elevated Tank

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.