BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Provo, Utah. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

NOTICE TO CONTRACTORS Timpview High School Addition and Renovation 3570 Timpview Dr., Provo, Ut 84604 Westland Construction, Inc., as Construction Manager for Provo City School District, is requesting labor and material bids for the construction of the Timpview High School Addition and Renovation in accordance with plans, specifications and bid documents as prepared by VCBO Architecture. A pre-bid walkthrough will be held for all interested subcontractors on Thursday, May 13th at 1:00PM. Please meet at the Main North Entrance. Proposals will be received on or before Tuesday, May 25th at 2:00PM prevailing Mountain Time at the offices of Westland Construction, Inc. (Email & Fax Number listed below). All proposals must be submitted on the provided Bid Form found in the project manual. Questions on scope of work, trade coordination and bidding should be directed to Mark Jensen at Westland Construction and Mike Ririe at VCBO Architecture. Westland Construction, VCBO Inc. Architecture 1411 West 1250 South 524 S. 600 E. Orem, Utah 84058 Salt Lake City Phone: 801-374-6085 Utah 84104 Phone: 801-575-8800 Fax: mjensen@westlandconstruction.com mririe@vcbo.com www.westlandconstruction.com vcbo.com A 5% BID SECURITY MUST BE ATTACHED FOR BIDS OVER $100,000. PLEASE SUBMIT COPY OF BID SECURITY VIA FAX OR EMAIL. Bid Security may be a bid bond made payable to the order of Westland Construction, Inc. The bid security of the accepted bidder shall be forfeited in the case of failure or refusal to enter into a contract and furnish payment and performance bonds as may be required. Time is of the essence on this project. Refer to the Bid Documents for specific schedule and liquidated damage requirements. Inasmuch as the Owner is a political subdivision of the State of Utah, all trades on the project must certify by affidavit, prior to commencing any work on the project, that they participate in a Status Verification System to verify the work eligibility status of its new employees in accordance with Section 63G-11-103 Utah Code Annotated. Any award or rejection, in whole or in part, relating to this project is contingent upon budget restraints. Refer to the Bid Documents for Proposal Guidelines. The Owner and Construction Manager reserve the right to accept or reject any and all proposals or alternates with or without cause for any reason determined in its sole subjective determination to be in the Owner's best interest and to waive any informality in bidding. Proposals shall be properly executed upon the Bid Form with all items filled out. The completed form shall be without deletions, alterations or erasures. Proposal forms are available at the office of the construction manager and in the specification manual. Before submitting a proposal, bidders shall carefully examine the plans, read the project manual, all addenda and all other bid documents. They shall visit the site of work and shall fully inform themselves as to all existing conditions and limitations. They shall include in the proposal a sum to cover the cost of all items included in the bid documents and within the time frame stated in the bid documents. Securing Documents: Plans and project manual will be available to interested parties no earlier than Tuesday, May 11th. Plans can be viewed online at www.westlandconstruction.com. Contact Mark Jensen at mjensen@westlandconstruction.com to make arrangements to receive bidding documents. Contractor's Qualification Statement: Any bidder shall, upon request, submit a Contractor's Qualification Statement, AIA Document A305. Failure to show a statement satisfactory to the Owner will be reason to reject the proposal as non-responsive. Legal Notice 7692 Published in Daily Herald on May 7, 8, 9, 2021

Post-Bid

Educational

$200,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
31
Bidding Soon
532
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2021

June 24, 2021

img_map_placeholder

3570 Timpview Dr, Provo, UT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.