Site work and renovation of a municipal facility in Casper, Wyoming. Working plans call for the renovation of a 35,000-square-foot, two-story above grade municipal facility; and for site work for a municipal facility.
https://www.mdjonline.com/tribune/regional/renovations-proposed-for-casper-ice-area-city-hall/article_ddd23f0c-cc17-5632-9c80-06e329dd286a.html Dec. 10 Major changes to Casper Ice Arena and city hall could be coming soon. The ice arena, built the '80s, serves as home base for Casper's ice hockey community. The parks department believes it to be the only rink open in Wyoming during the summer months, Parks, Recreation and Public Facilities Director Zulima Lopez said in a Dec. 6 memo to the City Manager's Office. But it's operating at a ... _________________________________________________________ https://oilcity.news/community/city/2022/04/12/with-only-2-68m-on-hand-for-city-hall-upgrades-casper-to-reject-five-bids-all-above-6m/ April 13, 2022 With only $2.68M on hand for City Hall upgrades, Casper to reject five bids, all above $6M CASPER, Wyo. -- The City of Casper has been looking to make upgrades at Casper City Hall, a facility built in 1978. City officials refer to the proposed upgrades as the City Hall "S.A.F.E." Building Remodel Project, with the acronym standing for "security, aesthetics, functionality and efficiency." A city staff memo states the project's goals include: Correct exterior and interior safety vulnerabilities Upgrade fire suppression system (the facility currently violates fire code) Address "deficiencies" on both floors of the building that "hinder customer service and operational efficiency" Bring bathrooms and other access areas into compliance with the Americans with Disabilities Act Add space to accommodate current and future staffing needs Improve aesthetics of the exterior to make City Hall more inviting Improve entry space to encourage engagement between visitors and staff Conduct general maintenance improvements, including off-track mats, flooring, overhead lighting and paint upgrades Improve HVAC Improve atrium lighting Stateline No. 7 Architects estimated the City Hall upgrades would cost around $4.5 million, but the five construction companies' bids, which the city opened in March, all exceeded $6 million. Higher costs for materials amid inflation "resulted in much higher bids than expected," a memo from city staff states. City Manager Carter Napier told the council during its Tuesday, April 12, work session that the city has about $2.68 million set aside in its Capital Reserves fund for the proposed upgrades. With the bids coming in north of $6 million, Napier said he recommended the council reject all bids and look into altering the scope of the project, then try again at a later date. Councilmember Lisa Engebretsen asked whether the city could move forward with just some of the proposed upgrades using the available $2.6 million. She said doing so might help avoid costs further ballooning in the future. Napier said if the council decided to take that approach, he would recommend the city begin with fire suppression and HVAC upgrades. While those upgrades may be able to be done ahead of other proposed renovations, Napier said this approach would have the drawback of disrupting operations at City Hall twice -- once for the HVAC and fire suppression upgrades and a second time for the other upgrades being considered. Councilmember Kyle Gamroth asked whether there is any indication that construction costs will continue rising or whether they may come back down. Casper Public Services Director Andrew Beamer said he didn't know, though he thinks there is a chance supply chain issues could ease at some point and prices might stabilize. Until that happens, he said the high construction prices are making for "a very interesting bidding environment we are in." Councilmember Bruce Knell said he would prefer rejecting bids as Napier suggested, adding there are some other opportunities "that we can't quite speak about that might come up." In a straw poll, the council indicated support for Napier's suggestion to reject all five bids for the upgrades. That is an action the council will be asked to formally consider during a regular meeting. The five bids the city received are as follows: The city initially planned to fund the project largely through $2.68 million in Capital Reserves funds it has on hand, though staff note in the memo that the city anticipated HVAC upgrades would push the project cost up by about $1.7 million. After receiving the higher bids, staff met with State Line No. 7 Architects and Transmission Distribution Service to discuss possible ways to reduce the project cost. "The primary items that were considered for cost savings included interior product substitutions; elimination of new furniture; exterior substitutions and eliminations; reduction in landscaping density; elimination of the enlarged Council Meeting Room; elimination of upgrades in the Council Chambers; elimination of permit fees and solid waste fees; and elimination of safety features for which a DHS grant could be applied," the memo states. "The total cost reduction for these items was $988,415." _________________________________________________________ Buildings Rehabilitation/Renovation The renovation of an existing two-story building (no basement) of approximately 35,000 total square feet including a small addition. The existing building is constructed of C.M.U. bearing walls, spread footings, slab-on-grade first floor, pre-cast twin-tee concrete second floor, and steel joist roof framing and decking constructed in 1977. Est. Value: $ 4,250,000.00 Est. Completion Date: May 15, 2023
Final Planning
Municipal
$819,516.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2022
September 8, 2023
200 N David St, Casper, WY
Related To This Project
Casper, WY
Bid Date: Jun 08 2023
Casper, WY
Bid Date: Jul 20 2023
Casper, WY
--
Casper, WY
Bid Date: Jul 06 2023
Casper, WY
Bid Date: Jun 20 2023
Casper, WY
--
Casper, WY
Bid Date: Aug 03 2023
Casper, WY
Bid Date: Mar 31 2023
Casper, WY
Bid Date: Jun 08 2023
Casper, WY
Bid Date: Jun 08 2023
Casper, WY
Bid Date: Jun 02 2023
Casper, WY
Bid Date: Jan 24 2024
Casper, WY
Bid Date: Jun 07 2023
Casper, WY
Bid Date: Jun 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.