BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2021 at 8:00 PM

Updated January 25, 2024

Site work and paving for a civil project in Bainbridge, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The project includes roadway, gravity sanitary sewer and water main infrastructure improvements. The total length of the roadway section of the project is 1,997 feet or 0.38 mile and runs between Taurus Way and Butler Ferry Road at its intersection with Commodore Industrial Boulevard. Improvements include construction of a 2-lane 24-foot wide asphalt ditch section roadway and associated storm drainage culverts and storm sewer. The total length of the gravity sanitary sewer extension is 1,657 if of 8" PVC and includes 5 manholes and a connection to an existing pump station. Approximately half of the sanitary sewer extension runs west from the existing pump station paralleling the north side of Butler Ferry Road and half runs north from Butler Ferry Road paralleling the east side of the new roadway. The total length of the water main is 2,150 if and includes 1,957 If 10-inch PVC, 67 lf of horizontal directional drilled (HOD) 10-inch HDPE, 63 lf 6" PVC water line, 63 lf 4" PVC water line and 5 fire hydrants The Contract includes erosion, sedimentation & pollution control for approximately 6.0-acres of disturbed area. A bid bond shall be required in the amount of 5% of the total bid amount. A Contract Performance Bond and a Materials and Payment Bond will be required of the successful bidder. No submitted proposal may be withdrawn for a period of sixty (60) days after the closing time scheduled for the receipt of bids. The CITY OF BAINBRIDGE, hereinafter called the Owner, reserves the right to reject any or all Proposals and to waive any formality or technicality and to award the Proposal as may be in the best interest of the Owner, or readvertise for bids. The Contractor shall warrant all materials and labor for one year after the date of final acceptance by the Owner and the Engineer. Georgia law requires that any private employer that contracts with a city for a public works contract must be registered for and use E-Verify. As such all contractors must sign the Contractor E-Verify Affidavit, all subcontractors must sign the Subcontractor E-Verify Affidavit and all Sub-subcontractors must sign the Sub-Subcontractor Affidavit. The contractor is responsible for all subcontractor affidavits and the subcontractors are responsible for the sub-subcontractors affidavits. The Contractor E-Verify Affidavit shall be included with the Proposal. The CONTRACTOR will furnish all of the materials, supplies, tools, equipment, labor, and other services necessary for the construction and completion of the PROJECT described herein.

Award

Roads / Highways

$991,224.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
40
Bidding Soon
762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2021

July 9, 2021

Project location map

butler ferry road and taurus way, Bainbridge, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.