Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2023 at 8:00 PM

Updated January 27, 2024

Site work and new construction of a pre-engineered storage facility in Gillette, Wyoming. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Construction of a 120 foot by 80 foot pre-engineered fabric building to house roadway snowmelt and traction materials. Building to be constructed at the 800 N. Burma Avenue Central Warehouse complex in Gillette, Wyoming. Project to include concrete footings, concrete foundation walls, pre-engineered metal building, concrete slabs, lighting, site grading and surfacing, storm drainage improvements, and associated site work.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$1,081,313.00

Public - City

New Construction, Site Work

20

7

6

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
114
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

January 22, 2024

Project location map

810 N Burma Ave, Gillette, WY


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed