Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2022 at 8:00 PM
Updated October 24, 2023
Site work and paving for a road / highway in Higginsville, Missouri. Design plans call civil work for a road / highway.
As of May 13, 2022, a design engineer has been selected. *The previous solicitation is listed below for reference Location: MO 13 from I-70 to BUS 13 Proposed Improvement: Adding passing and turn lanes Length: 12 miles Approximate Construction Cost: $12,200,000 DBE Goal (if applicable) 0% Consultant Services Required: Survey for RW needs Other Comments: Interviews or presentation will not be required for the consultant selection. Tentative Date of Consultant Selection-June 23, 2021 Scope of work for survey; 1. Research existing and surrounding properties. 2. Obtain Last Deeds of Record and Title Commitments from MoDOT approved Title Company. 3. Retrace the Existing Route 13 C/L alignment from Station 265+00.00(Lafayette County) to Station 400+25.00(Johnson County). Approximately 11.9 miles 4. Retrace the Existing Route 13 Right of Way and Permanent Easements from Station 265+00(Lafayette County) to Station 398+49.00(Johnson County). 5. Retrace any necessary section lines to assist with right-of-way reestablishment and new property acquisition. 6. Retrace any necessary subdivision plats to assist with right-of-way reestablishment. 7. Prepare a Location Survey for new property acquisitions that meets current Missouri Standards for Property Boundary Surveys. 8. Monument the new and existing right-of-way in accordance with MoDOT Standards and the current Missouri Standards for Property Boundary Surveys. 9. Prepare property descriptions for new property acquisitions. 10. File the Location Survey with Lafayette and Johnson Counties. 11. Photogrammetry will be provided, these control points will need to be used. The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Adding passing and turn lanes
Design
Roads / Highways
$12,200,000.00
Public - State/Provincial
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2022

MO-13, Higginsville, MO
Related To This Project
Higginsville, MO
Bid Date: Jun 02 2022
Higginsville, MO
Bid Date: Mar 23 2023
Higginsville, MO
--
Higginsville, MO
--
Higginsville, MO
Bid Date: Jan 27 2022
Higginsville, MO
Bid Date: Nov 02 2023
Higginsville, MO
Bid Date: Dec 13 2023
Higginsville, MO
Bid Date: Dec 15 2023
Higginsville, MO
Bid Date: Jan 20 2023
Higginsville, MO
Bid Date: Dec 16 2022
Higginsville, MO
Bid Date: Dec 16 2022
Higginsville, MO
Bid Date: Dec 16 2022
Rolla, MO
Bid Date: Mar 16 2022
Kirkwood, MO
--
Cape Girardeau, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.