Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 25, 2024 at 8:00 PM
Updated October 1, 2024
Site work, paving and new construction of a mixed-use development in Tulsa, Oklahoma. Completed plans call for the construction of a 40,000-square-foot transportation facility; for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.
As of October 25, 2024, construction is expected to begin December 2024 and end June 2026. All trades are let. W912BV-XX-X-XXXX Project Description: This project will be a design-bid-build construction project for an approximately 40,000 square foot kitting facility that is primarily warehouse space, but also includes ancillary administrative and support spaces. This facility will be standalone and consists of a panel shop, kitting build up area, kitting repair area, kitting system area, inventory area, drop off area, administrative area, restrooms, and utility rooms. Exterior design will match the adjacent hangars and will consist of metal roof panels and metal wall panels with brick wainscot. This project also includes clearing and grading , storm drainage, aircraft parking/movement area, utility infrastructure systems, and other supporting facilities. Facilities will be designed as permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01. In accordance with DFARS 236.204, Disclosure of the of Construction Projects, the estimated of construction for this project is between $10,000,000 and $25,000,000. The North American Industry Classification System code for this procurement is 236220, which has a small business size standard of $45M. This requirement will be solicited as Unrestricted. Estimated of construction of this project is 365 calendar days. Anticipated solicitation issuance date is on or about 29 August 2023, and the estimated proposal due date will be on or about 16 October 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Deadline 11/02/2023 If the client requests, questionnaires may be submitted directly to the Governments point of contact, Tyler Godwin via email Tyler.L.Godwin@usace.army.mil
Award
Transportation Terminals
$27,907,038.00
Public - Federal
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 15, 2023
December 2, 2024
2488 E 81st St, Tulsa, OK
Related To This Project
Tulsa, OK
Bid Date: Jun 29 2022
Tulsa, OK
Bid Date: Jun 08 2022
Tulsa, OK
Bid Date: Jun 06 2022
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
Bid Date: Jun 30 2022
Tulsa, OK
Bid Date: May 24 2022
Tulsa, OK
Bid Date: Jun 28 2022
Tulsa, OK
--
Tulsa, OK
Bid Date: Jun 17 2022
Tulsa, OK
--
Tulsa, OK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.