BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 17, 2021 at 8:00 PM

Updated January 26, 2024

Renovation of a library in New York, New York. Completed plans call for the renovation of a library.

This Project consists of the replacement of existing 2100 LBS capacity dual-roped hydraulic elevator with new 3000 LBS capacity dual-roped hydraulic elevator; replacement of existing rooftop packaged air-cooled air conditioning unit with new; replacement of existing split-system air conditioning units with new; replacement of existing heating boiler system; installation of new Building Management System (BMS). LOCATION: 209 West 23rd Street Manhattan, NY 10011

Bid Results

Library

$2,600,214.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

37

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,021
Active Projects
567
Bidding Soon
7,712
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2021

August 11, 2021

Project location map

209 W 23rd St, New York, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.