Site work and new construction of a road / highway in Charlotte, North Carolina. Completed plans call for the construction of a road / highway; and for site work for a road / highway.
Charlotte Water (CLTWater) is seeking Progressive Design-Build services to assist with the analysis, design and construction of the Mallard Creek Interceptor Improvement Project - Phase 1 and 2 (Project). Proposers need to assemble a team of experts including at a design, survey, geotechnical, environmental, permitting, pre/post blasting surveys and related seismic monitoring, real estate acquisition including appraisal and legal, and communication experts and construction contractors. The Mallard Creek Basin service area consists mainly of residential zoning, with increasing commercial development around the new Blue Line Extension, UNC Charlotte, and the University Research Park. Infrastructure improvements are needed, not only to support current flows and maintain required service levels within the Mallard Creek Basin, but to also keep pace with the rapid growth and development. Hydraulic modelling conducted for the Mallard Creek Basin indicated that the Mallard Creek interceptor is currently capacity limited under two-year peak flow conditions. Future population and flow projections further suggested that flows in the basin would likely grow about 20 percent every 10 years. Per Charlotte Water's Capacity Assurance Program (CAP), for the purposes of accepting new connections, adequate capacity exists when the sanitary sewer system can convey flows at a 2-year Level of Service (LOS) between the point of connection and the wastewater treatment plant without excessive surcharge, while future enhancements are sized for the 10-year peak flow condition. Notice to Proceed September, 2021 Preliminary Engineering Phase 1 & 2 April 2022 60% Design GMP Submittal - Phase 1 September 2022 GMP Submittal - Phase 2 TBD Easements Acquisition (Phase 1 and 2) September 2023 Final Design (Phase 1 and 2) April 2023 Phase 1 Construction Start (NTP) May 2023 Phase 1 Construction Substantial Completion May 2025 The anticipated budget for the Project is as followed: * Targeted Rehabilitation Construction (CLT Water will provide construction documents): $300,000 * Phase 1 Design and Construction: $57,700,000 * Phase 2 Design and Construction: $35,600,000 Last Day for Questions June 4, 2021 at 5:00 PM Selection Notification June 23 - June 29, 2021 Finalize Preconstruction Scope and Fee June 30, 2021 Recommendation to Council August 9, 2021 Proposers may submit written questions concerning this RFQ to Katherine Osborne via email at katherine.osborne@charlottenc.gov. Questions received after the stated deadline in the Schedule of Events will not be answered. Proposers are encouraged to contact the Charlotte Business INClusion (CBI) Liaison for assistance or clarification with issues specifically related to the City's CBI Program. The point of contact is Frederica Love, who may be reached via email at flove@charlottenc.gov. Please contact the owner for bidding documents. Appraisers will conduct a site visit to inspect the property. The Appraisal firm will make every reasonable effort to contact the property owner prior to site inspection. The appraisal company must allow the property owner or representative to accompany the appraiser on the site inspection. The appraisal company is required to document their efforts to reach the property owner or representative. If the property owner or representative does not accompany the appraiser on the site inspection, the appraisal company must document the reason. As of 8/9/21, no award has been made for this project.
Post-Bid
Roads / Highways
$93,300,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2021
May 1, 2023
To Be Determined, Charlotte, NC
Related To This Project
Charlotte, NC
Bid Date: Aug 09 2018
Charlotte, NC
Bid Date: Aug 31 2022
Charlotte, NC
Bid Date: Apr 24 2024
Charlotte, NC
Bid Date: Dec 05 2023
Charlotte, NC
--
Charlotte, NC
Bid Date: Jul 27 2023
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
Bid Date: Sep 14 2022
Charlotte, NC
Bid Date: Aug 11 2022
Charlotte, NC
--
Charlotte, NC
Bid Date: Sep 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.