Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2021 at 8:00 PM

Updated January 29, 2024

Site work and paving for a bridge / tunnel in Montevallo, Alabama. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Sealed bids for the following: Bridge Replacement and Approaches on CR 24 over Spring Creek, in Montevallo, Alabama, Project Length = 0.176 mile. This bid is intended to comply with Alabama Code Title 39, of the Alabama Public Works Law. Bidders shall be required to comply with the provisions of Title 39 of the Alabama Code regardless if the requirement is explicitly detailed in the bid proposal or not. The undersigned further agrees to complete the entire project in one hundred eighty (180) working days. Geometric Controls are required.

Award

Bridges / Tunnels

$6,000,000.00

Public - City

Paving, Site Work

54

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
46
Bidding Soon
988
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2021

August 10, 2021

Project location map

Multiple Locations, Montevallo, AL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed