BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Moncks Corner, South Carolina. Completed plans call for site work for a water / sewer project.

***As of July 14 , 2021 project has been awarded with the amount of 2,541548.18. "Berkeley County is requesting bids from qualified firms for force main replacement of Pump Station 007 located at the College Park Road/Gleason Drive Intersection. Performed work includes installation of approximately 7,707 LF (linear feet) of 18-inch force main which includes 160 LF of 30-inch steel casing by jack & bore, 3,385 LF of 18" DR18 C900 Fusible PVC (FPVC) to be installed by horizontal directional drill, and necessary appurtenances. Bids over $100,000.00 shall be accompanied by a bid bond or certified cashier's check in an amount equal to 5% of the bid. Deadline for Written Questions : June 11, 2021 at 12:00 PM local time This Proposal does not commit Berkeley County to award a Contract, to pay any costs incurred in the preparation of a Proposal or to procure or contract for the articles of goods or services. The County reserves the right to waive any informalities or irregularities, to reject any or all Bids received as a result of this request, or to cancel in part or in its entirety this Proposal, if it is in the best interest of the County to do so. This Project will be funded by the State Revolving Fund (SRF) under project number 496-26. Offersmust comply with all applicable state and federal requirements identified in the Bidding Documents including the David-Bacon Act and "American Iron and Steel" Provisions. Offers must follow the "Good Faith Efforts" strategies and implement procedures that ensure Disadvantages Business Enterprise (DBE) firms are given opportunities for meaningful participation if subcontracts are awarded. The DBE "fair share" goal is a responsible amount of funds proportionate to the project's construction costs and is currently established as a participation rate of 2.5% for Minority Business Enterprise (MBE) and 2.5% for Women Owned Business Enterprise (WBE).

Award

Water / Sewer

$2,541,548.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
63
Bidding Soon
761
All Active Projects
355
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2021

July 26, 2021

img_map_placeholder

College Park Road, Moncks Corner, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.