BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Cleburne, Texas. Completed plans call for the renovation of a 140,000-square-foot educational facility; for the addition of a educational facility; and theater / auditorium.

The general scope and budget are as follows: See Below for Project Information. Other projects as identified within the 2021 Bond Program may be added. 1. Additions and Renovations, Smith Middle School Architect: PBK Architects Proposed Scope of Work: Renovations to existing Smith Middle School (approx. 140,000 square feet), renovations include the cafeteria and service line, stage, special education area, fine arts area, 2nd floor general renovations and restroom addition, and general finishes. Total Construction Budget (excluding soft cost): $5,500,000.00 Project Schedule: July 2023 Substantial Completion. Special schedule and considerations are as follows: a. This schedule is preliminary and will be finalized during the design phase. b. This project is to be designed and built on a phased construction schedule of daily school and during the different athletic seasons, District and community activities during the duration of the project. 2. Additions and Renovations, Don Smith Performing Arts Center Architect: PBK Architects Scope of Work: Renovations to existing Don Smith Performing Arts Center (approx. 140,000 square feet), renovations include stage finishes, theatrical lighting, and sound, HVAC system, house lights, new ceiling, new lobby restrooms, fill in pit and expand thrust stage. Total Construction Budget (excluding soft cost): $8,524,399.00 Project Schedule: July 2023 Substantial Completion. Special schedule and considerations are as follows: a. This schedule is preliminary and will be finalized during the design phase. b. This project is to be designed and built on a phased construction schedule of daily school and during the different athletic seasons, District and community activities during the duration of the project.

Post-Bid

Educational

$8,524,399.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
59
Bidding Soon
3,544
All Active Projects
1,393
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

August 12, 2022

img_map_placeholder

To Be Determined, Cleburne, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.