BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Bentonville, Arkansas. Conceptual plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; and for paving for a sidewalk / parking lot.

All bids have been rejected. No intent to rebid at this time. Bid date extended to 4/22/22 Deadline for Submission of Requests for Information, Questions or Clarifications: APRIL 5 - 4:30 P.M. CST Questions should be submitted only to the Purchasing Office via written communication only to purchasing@bentonvillear.com. Bid Bond Requirement: 5% Bid Bond Required The Project goal is to re-crown the field to facilitate positive drainage and alleviate areas that capture and hold runoff The dimensions of Memorial Soccer Field Number 9 are approximately 230' (two hundred thirty feet) by 340' (three hundred forty feet). 1) The removal of the existing turf and topsoil to the grade which has been determined by the City. A formal survey will be provided by the City to determine the desired grade. This information will be communicated via Addendum to this Invitation for Bid. 2) Hauling and disposing of the removed turf, any unused topsoil, and any other debris caused by the work off-site. All disposal shall be performed in a legal manner, according to all applicable laws, codes and regulations. 3) The field shall have a minimum slope of 1% (one percent) and a maximum of 2% (two percent). The end-to-end slope shall be flat (0.00%). The awarded Bidder shall slope the field to drain as appropriate for the field location (see #1 above). 4) Graded areas shall be uniform and smooth, free from rock, debris or irregular surface changes. Finished subgrade surface shall not be more than 0.10-Feet above or below the established finished subgrade elevation. 5) Locating and protecting all irrigation and utilities located on the work site(s). The awarded Bidder shall adjust the irrigation depth and/or height as necessary to prevent damage to irrigation lines and heads, as well as ensure proper restoration to match the new/reconstructed elevation, operation and coverage of irrigation after the infield grading is complete. 6) The awarded Bidder shall add screened topsoil material, if required, as laser grade to the determined elevations and 1% (one percent) drainage. If any additional topsoil material is needed, the material must be approved by the City prior to use

Project Abandoned

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
36
Bidding Soon
603
All Active Projects
267
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2022

June 1, 2022

img_map_placeholder

1600 NE John Deshields Blvd, Bentonville, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.