BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in North Easton, Massachusetts. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 02, 2022, project was awarded to Ramco Survey Stakes Co., Inc with a base amount of $319,499 and with 2 additional courts of $29,000/each** The two bids were received were over the appropriated budget and the project is not being awarded. Work includes construction of proposed pickleball courts and parking lot upgrade in conformance with plans and details issued by the Town of Easton. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor is to perform Site Paving and all of the site work in accordance with the accompanying specifications and plans dated . The work shall include all materials, labor, installation equipment, backfill, and repair to road crossings as necessary to complete construction. Unless otherwise specified, the plans and specifications are intended to include everything necessary for proper installation and completion of the work, whether each item is mentioned herein or not. The plans and specifications are intended to be cooperative, and any item called for in one and not the other shall be as if called for in both. If a discrepancy exists between the plans and the specifications, the plans take precedence. The omission of any material from this specification is not to be interpreted to the effect that omitted material will not be furnished and installed by the Contractor. All labor, unless specifically indicated as being furnished by others, must be furnished by the Contractor under this Contract

Award

Sidewalks / Parking Lot

$377,499.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
531
Active Projects
249
Bidding Soon
3,653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

June 14, 2022

Project location map

184 Washington St, North Easton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.