EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2021 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a library in Lombard, Illinois. Completed plans call for the construction of a library; and for site work for a library.

Bidders were directed to submit all questions regarding the project in writing to Fred Marano at fmarano@fquinncorp.com. BP#3-03 Concrete; 04 Masonry; 06a Carpentry / General Trades; 06b Millwork / Casework; 07a Waterproofing & Sealants; 07b Roofing & Sheet Metal; 07c Applied Fire Protection; 08a Doors Frames & hardware; 08b Sectional Doors; 08c Aluminum Glass & Glazing; 09a Drywall & Metal Framing; 09b Tiling; 09c Acoustical Ceilings & Treatments; 09d Resilient Flooring & Carpet; 09e Paint & Wallcovering; 10 Operable Partitions; 12 Window Treatments; 14 Elevators; 21 Fire Protection Sprinklers; 22 Plumbing; 23 HVAC, 26 Electrical & Low Voltage; 32a Asphalt Paving; 32b Pavers & Segmental Walls; 32c Landscape & Irrigation; 32d Fencing & Gates. No oral, telephonic, telegraphic or facsimile proposal shall be considered. Proposals shall be signed by the bidder, giving his full name and business address, and stating whether an individual, partnership or corporation. All interested contractors need to contact the Construction Manager noted below to be placed on the bidders list. Helen M Plum Memorial Public Library District reserves the right to reject any or all bids, to waive irregularities and to accept the bid from the lowest responsive, responsible bidder which is considered to be in the best interest of the District. All bids are to be in accordance with the Instructions to Bidders as noted in the Project Manual. Work of each Contract can be summarized by references to the Contract Documents, General Conditions, Supplementary Conditions, Specification Sections, Drawings, Addenda and Modifications to the Contract Documents issued subsequent to the initial printing of this Project Manual and including, but not limited to, printed material referenced by any of these. The Bidder acknowledges that all Contract Documents were available to the Bidder and that the Bidder has reviewed all of them. The contractor shall supply all labor, transportation, apparatus, scaffolding, and any tools necessary for the completion of the work, maintain and remove temporary equipment, and construct in excellent and workmanlike manner the complete work and everything properly incidental thereto as stated in the contract documents or reasonably implied there from. It is not the intent of the contract documents to set forth in detail every item necessary for the construction of this project. Contractor must be qualified for this work and must, without direction, furnish and install everything necessary to provide construction complete and in acceptable order ready for use without additional work. All parts must be coordinated, complete, and ready to operate and delivered to the Owner in new condition. Bid REsults: CONCRETE ELLIOT CONSTRUCTION, GLEN ELLYN $ 980,870.00 MASONRY RASCO MASON CONTRACTORS, $ 570,000.00 CARPENTRY / GENERAL TRADES HARGRAVE BUILDERS INC, $ 666,450.00 MILLWORK / CASEWORK AMERISCAN DESIGNS INC AMERISCAN DESIGNS INC WATERPROOFING / SEALANTS SAGER SEALANT, $ 79,795.00 X ROOFING & SHEET METAL JL ADDLER ROOFING & SHEET METAL $ 797,760.00 APPLIED FIRE PROTECTION ASC INSULATION FIRE PROOFING N $ 98,132.55 DOORS, FRAMES, AND HARDWARE LAFORCE LLC $ 133,871.00 SECTIONAL DOORS HOUSE OF DOOR $ 67,777.00 ALUMINUM, GLASS, AND GLAZING LS GLASS LLC $ 1,195,000.00 DRYWALL & METAL FRAMING RB CONSTRUCTION INC, $ 1,000,019.00 TILING CENTRAL RUG AND CARPET $ 278,800.00 ACOUSTICAL CEILING & TREATMENTS INTEGRATED SPECIALTY CONTRACTORS $ 351,800.00 RESILIENT AND CARPET FLOORING CONSOLIDATED FLOORING OF CHICAGO $ 242,242.00 - New Library Building MAY DECORATING INC, $ 116,750.00 OPERABLE PARTITIONS HUFCOR INC $ 149,940.00 WINDOW TREATMENTS INDECOR INC, $ 124,000.00 ELEVATOR SCHINDLER ELEVATOR CORP $ 178,700.00 FIRE PROTECTION NELSON FIRE PROTECTION $ 155,644 PLUMBING HARTWIG MECHANICAL INC $ 583,419.00 HVAC FLOTECH MECHANICAL SYSTEMS $ 1,960,000.00 ELECTRICAL / LOW VOLTAGE / AV RIDGEVIEW ELECTRIC $ 2,140,975.00 PAVING CHAMPION PAVING CORP $ 142,875.00 PAVERS & SEGMENTAL WALLS ALLIED LANDSCAPING CORP $ 152,000.00 LANDSCAPE & IRRIGATION BREEZY HILL LANDSCAPING $ 248,600.00 FENCING & GATES ACTION FENCE CONTRACTORS $ 162,580.00

Bid Results

Library

$12,836,520.00

Public - City

New Construction, Site Work

178

37

102

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Operation Data, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Decorative Metal, Decorative Metal Stairs
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Vapor Retarders, Roofing and Siding Panels, Composite Roof Panels, Composite Wall Panels, Flashing and Sheet Metal, Sheet Metal Roofing, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Panel Doors, Sectional Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Plaques, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Rugs and Mats, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Facility Water Distribution Piping, Domestic Water Piping, Domestic Water Pumps, Facility Sanitary Sewerage, Facility Sanitary Sewers, Facility Storm Drainage, Sump Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Air Coils, Fan Coil Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Unit Paving, Porous Unit Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Structures, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Hooks, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
161
Bidding Soon
2,160
All Active Projects
1,086
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2021

August 18, 2021

img_map_placeholder

110 W Maple St, Lombard, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Helen Plum Public Library (HPL) - Bid Package #3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.