BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a library in Lombard, Illinois. Completed plans call for the construction of a library; and for site work for a library.

Bidders were directed to submit all questions regarding the project in writing to Fred Marano at fmarano@fquinncorp.com. BP#3-03 Concrete; 04 Masonry; 06a Carpentry / General Trades; 06b Millwork / Casework; 07a Waterproofing & Sealants; 07b Roofing & Sheet Metal; 07c Applied Fire Protection; 08a Doors Frames & hardware; 08b Sectional Doors; 08c Aluminum Glass & Glazing; 09a Drywall & Metal Framing; 09b Tiling; 09c Acoustical Ceilings & Treatments; 09d Resilient Flooring & Carpet; 09e Paint & Wallcovering; 10 Operable Partitions; 12 Window Treatments; 14 Elevators; 21 Fire Protection Sprinklers; 22 Plumbing; 23 HVAC, 26 Electrical & Low Voltage; 32a Asphalt Paving; 32b Pavers & Segmental Walls; 32c Landscape & Irrigation; 32d Fencing & Gates. No oral, telephonic, telegraphic or facsimile proposal shall be considered. Proposals shall be signed by the bidder, giving his full name and business address, and stating whether an individual, partnership or corporation. All interested contractors need to contact the Construction Manager noted below to be placed on the bidders list. Helen M Plum Memorial Public Library District reserves the right to reject any or all bids, to waive irregularities and to accept the bid from the lowest responsive, responsible bidder which is considered to be in the best interest of the District. All bids are to be in accordance with the Instructions to Bidders as noted in the Project Manual. Work of each Contract can be summarized by references to the Contract Documents, General Conditions, Supplementary Conditions, Specification Sections, Drawings, Addenda and Modifications to the Contract Documents issued subsequent to the initial printing of this Project Manual and including, but not limited to, printed material referenced by any of these. The Bidder acknowledges that all Contract Documents were available to the Bidder and that the Bidder has reviewed all of them. The contractor shall supply all labor, transportation, apparatus, scaffolding, and any tools necessary for the completion of the work, maintain and remove temporary equipment, and construct in excellent and workmanlike manner the complete work and everything properly incidental thereto as stated in the contract documents or reasonably implied there from. It is not the intent of the contract documents to set forth in detail every item necessary for the construction of this project. Contractor must be qualified for this work and must, without direction, furnish and install everything necessary to provide construction complete and in acceptable order ready for use without additional work. All parts must be coordinated, complete, and ready to operate and delivered to the Owner in new condition. Bid REsults: CONCRETE ELLIOT CONSTRUCTION, GLEN ELLYN $ 980,870.00 MASONRY RASCO MASON CONTRACTORS, $ 570,000.00 CARPENTRY / GENERAL TRADES HARGRAVE BUILDERS INC, $ 666,450.00 MILLWORK / CASEWORK AMERISCAN DESIGNS INC AMERISCAN DESIGNS INC WATERPROOFING / SEALANTS SAGER SEALANT, $ 79,795.00 X ROOFING & SHEET METAL JL ADDLER ROOFING & SHEET METAL $ 797,760.00 APPLIED FIRE PROTECTION ASC INSULATION FIRE PROOFING N $ 98,132.55 DOORS, FRAMES, AND HARDWARE LAFORCE LLC $ 133,871.00 SECTIONAL DOORS HOUSE OF DOOR $ 67,777.00 ALUMINUM, GLASS, AND GLAZING LS GLASS LLC $ 1,195,000.00 DRYWALL & METAL FRAMING RB CONSTRUCTION INC, $ 1,000,019.00 TILING CENTRAL RUG AND CARPET $ 278,800.00 ACOUSTICAL CEILING & TREATMENTS INTEGRATED SPECIALTY CONTRACTORS $ 351,800.00 RESILIENT AND CARPET FLOORING CONSOLIDATED FLOORING OF CHICAGO $ 242,242.00 - New Library Building MAY DECORATING INC, $ 116,750.00 OPERABLE PARTITIONS HUFCOR INC $ 149,940.00 WINDOW TREATMENTS INDECOR INC, $ 124,000.00 ELEVATOR SCHINDLER ELEVATOR CORP $ 178,700.00 FIRE PROTECTION NELSON FIRE PROTECTION $ 155,644 PLUMBING HARTWIG MECHANICAL INC $ 583,419.00 HVAC FLOTECH MECHANICAL SYSTEMS $ 1,960,000.00 ELECTRICAL / LOW VOLTAGE / AV RIDGEVIEW ELECTRIC $ 2,140,975.00 PAVING CHAMPION PAVING CORP $ 142,875.00 PAVERS & SEGMENTAL WALLS ALLIED LANDSCAPING CORP $ 152,000.00 LANDSCAPE & IRRIGATION BREEZY HILL LANDSCAPING $ 248,600.00 FENCING & GATES ACTION FENCE CONTRACTORS $ 162,580.00

Bid Results

Library

$12,836,520.00

Public - City

New Construction, Site Work

178

37

102

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
87
Bidding Soon
1,756
All Active Projects
761
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2021

August 18, 2021

img_map_placeholder

110 W Maple St, Lombard, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.