BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 11, 2024 at 7:00 PM

Updated January 27, 2024

Renovation of a pre-engineered storage facility in Great River, New York. Completed plans call for the renovation of a pre-engineered storage facility.

That sealed proposals to furnish and install a new pre-engineered metal filter building with concrete foundation and remove an existing pre-engineered metal filter building at the Douglas Avenue Well Field and Pump Station, Village of Northport, Town of Huntington, Suffolk County, NY. Question Acceptance Deadline 06/04/2021 03:00 PM EDT Questions are submitted online No

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$547,795.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
822
Active Projects
444
Bidding Soon
6,493
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2021

July 7, 2021

Project location map

Multiple Locations, Great River, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.